Uttarakhand Jal Sansthan Tender

View complete overview of Uttarakhand UJS Tender

Uttarakhand Jal Sansthan - UJS Tender

Works
Civil And Construction
Eprocure
Opening Date8 Oct 2022
Closing Date18 Oct 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of a Frenchwell including supply of all material, labour, T&P etc complete

1

-

-

... More
Protection work 5 %

1

-

-

... More
G.I. Medium quality 20mm dia

1500

-

-

... More
25mm dia

1700

-

-

... More
32mm dia

4900

-

-

... More
40mm dia

800

-

-

... More
50mm dia

600

-

-

... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock Soil mixed with boulder and bajri

2308.5

-

-

... More
Soft rock

769.5

-

-

... More
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. complete Gate valves (Class-I)as per I S 788/1997 20mm dia

1

-

-

... More
25mm dia

1

-

-

... More
32mm dia

1

-

-

... More
50mm dia

1

-

-

... More
Supply of all materials,labours ,T.&P. etc.and construct Gate valve chamber as per type design complete

6

-

-

... More
CWR Tand Repair

2

-

-

... More
Construction of R.C.C. Intake chamber having (1.0mx1.0mx1.5m) size at tapping point of Paniyar spring for collection of water including supply of all materials,labour, T&P etc. complete.

1

-

-

... More
Construction of R.C.C. Toe wall nearby of Paniyar spring for protection of source work including supply of all materials,labour, T&P etc. complete.

2

-

-

... More
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . 05.00 Kl

2

-

-

... More
7.50KL

1

-

-

... More
10.00KL

1

-

-

... More
20.00KL

1

-

-

... More
12.50 KL (Sump)

2

-

-

... More
Construction of Pump house at M.P.S. over steening of sump in 3.00 meter dia and 2.50 meter height, as per drawing including cost of all material labour, cartage and T&P etc all complete.

1

-

-

... More
Supply, installation, fixing and 12month operation/maintenance of Solar Pump of 2.00 HP, 63.00 Mtr. Head and 60.00 lpm discharge, with all accessories i.e., solar pannel, batteries,fencing work etc. complete.(As per market rate available including GST@ 5% on E&M works and 18% on civil works.)

1

-

-

... More
Excavation in ordinary soil mixed with shingle, boulder requiring special T&P like pickaxe, crowbar etc. for foundation including lift upto 1.5 m. and Lead upto 30 m. Including refilling, watering, ramming of excavated earth into the trenches or space between the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth upto a distance of 60 m. from trenches nearby sources, along the pipe line and around the sump.

13.49

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).

3.36

-

-

... More
RR stone masonary with 1:6 cement and sand mortar nearby sources and along the pipe line for proper completion of work.

33.46

-

-

... More
RR stone masonary laid in dry for proper completion of work along the pipe line.

9.45

-

-

... More
20mm thick plaster with 1:6 cement and sand mortar for proper completion of work.

22.5

-

-

... More
R.C.C. 1:1.5:3 cement, coarse sand & 20mm gauge gravel in wall & dome excluding supply of reinforcement steel & its bending but including fixing in position with 20BWG

1.15

-

-

... More
Providing Functional House hold tap Connection (FHTC) from exiting supply main to House hold including with Laying & Jointing of G.I Pipe (Medium)line including Excavation of Earth work upto Requried depth , Plain Cement Concret etc, including all mate

3720

-

-

... More
Making connection with the existing M.S. Galvanised Supply mains, including ferrule connection's specials etc fixing of bib cock in house hold including all material's and labour as per specificition and direction of Engineer Encharge for proper completi

124

-

-

... More
Mild steel work in RCC 1:1.5:3 cement concrete @ 1.00% of whole concrete work.

78.5

-

-

... More
Site clearance and other unforeseen items

1

-

-

... More
Testing of Pipe and other

4

-

-

... More
Godown and Hiring charges

6

-

-

... More
Advertisement board (SIZE 0.90 x 0.60 Mtr.)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.