Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Excavation
Eprocure
Opening Date6 Jan 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 96,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UKJS_67303_1Tender No
3417/Nivida Suchana/2023-24 dated 03.01.2024Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-Website
http://http://ujs.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Drilling of 550 mm dia bore by heavy duty direct rotary Rig machine in alluvial, boulders, pebbles, rocky stone, sticky clay etc from ground level upto entire depth for 300 mm dia linear assembly
200
-
-
Procurement of TW assembly as below (i) 300 mm dia MSERW Pipe 7.90 mm thick
(a) Blind & threaded
160
-
-
(b) Slotted & threaded
40
-
-
(ii) 300 mm dia Bail Plug
1
-
-
(iii) 300 mm dia MS Well cap
1
-
-
(iv) 300 mm dia MS Clamp with nuts & bolts
1
-
-
(v) Supply of Pea gravel of size 1.6 mm to 4.8 mm
120
-
-
(vi) Shrouding of Pea gravels in between bore and tube well assembly upto entire depth of tube well ordered by the department
200
-
-
Preparing & Lowering of tube well assembly starting from G.L. to the required depth including cutting, welding as required at site complete with all T&P required (i) Fixing of 300 mm dia bail plug with nut & U-bolt
1
-
-
(ii) Lowering of 300 mm dia MSERW housing pipe (Plain & Slotted pipe) as required
200
-
-
(iii) Fixing of 300 mm dia , 8 mm thick tube well cap.
1
-
-
(iv) Fixing of 300 mm dia M.S.D.I. housing clamp.
1
-
-
Dismantling of Rig machine and other equipments and clearance of site after finishing the Job.
1
-
-
Development of tube well byb 350 PSI/1400 CFM air compressor unit to the satisfaction of Engineer incharge to give sand free discharge atleast for 70 Hrs.and proper packing of pea gravels
100
-
-
Development of tube well by the suitable submersible OP unit complete with lowering and lifting of pumping plant having 2000 LPM discharge including running of OP unit and yield testing of tubewell by ‘V’ notch, at least for 60 Hrs to the satisfaction of Engineer incharge.
60
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements