Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Eprocure
Opening Date22 Nov 2022
Closing Date5 Dec 2022
Tender AmountRefer Documents
Costs
EMD
₹ 1,38,700Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UKJS_51983_4Bid Award Id
ViewTender No
1850/Vividh-02/2022-23 dated 17.11.2022Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-Website
http://http://ujs.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of R.R.1:6 Cement & Sand Motar along the source Protaction.
3.5
-
-
... More
RR stone masonary laid in dry for proper completion of work along the pipe line.
10.75
-
-
... More
Construction of Roughening Filter cum Collecting Chamber including supply of all material, labour, T&P etc complete
2
-
-
... More
Protection work nearby along the pipe line for proper completion
Construction of R.R.1:6 Cement & Sand Motar along the source Protaction.
1.15
-
-
... More
RR stone masonary laid in dry for proper completion of work along the pipe line.
2.53
-
-
... More
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 .
C.W.R 3.00KL
1
-
-
... More
C.W.R 12.50 KL
1
-
-
... More
C.W.R 7.50 KL
1
-
-
... More
Protection work nearby along the pipe line for proper completion
RRSM Laid in 1:6
3
-
-
... More
RRSM Laid dry
6.89
-
-
... More
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.
2
-
-
... More
Cartage of BFG Performed Pipe / steel in take chamber from Rishikesh to site store for proper completion of work distance upto 222 km pakka road & 3 km by head load ( including GST 18%)
1.8
-
-
... More
SUPPLY MAIN
-
-
-
... More
Dismantling of following dia screwed and socketed G.I. Pipe, Specials and fittings including taking out of dismantled GI Pipes and specials from trenches and stacking them properly within 50.00 mtr. But excluding the cost of eath work.
32 mm dia
1230
-
-
... More
40 mm dia
530
-
-
... More
50 mm dia
670
-
-
... More
The trenches and removal of surplus earth upto a distance of 60m From trenches including supply of labour, T&P, etc complete. Assuming that 70% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with single, bajri&boulders and rest 25%will be in soft rock.
Soil Mixed With Boulders & Bajri
1809.14
-
-
... More
Soft Rock
603.05
-
-
... More
Relaying of G.I. Pipe in true alignment in trenches including supply of all materials, labours, T&P etc. complete.
25 mm dia
1230
-
-
... More
32 mm dia
530
-
-
... More
40 mm dia
670
-
-
... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.
25 mm dia
1715
-
-
... More
32 mm dia
1920
-
-
... More
40 mm dia
880
-
-
... More
50 mm dia
500
-
-
... More
Supply of the following fittings including cartage of materials,labours ,T.&P. etc. Complete. 25 mm dia
4
-
-
... More
32 mm dia
2
-
-
... More
40 mm dia
2
-
-
... More
50 mm dia
2
-
-
... More
Supply of all materials,labours ,T.&P. etc.and construct Wheel/Gate valve chamber as per type design complete
10
-
-
... More
Protection work nearby along the pipe line for proper completion of work.
RRSM Laid in 1:6
20.31
-
-
... More
RRSM Laid dry
23.65
-
-
... More
Cartage of following pipes special & fitting from Rishikesh to site store for proper completion of work distance upto 252.00 km pakka road & 2.50 km by head load (including GST 18%)
166.9
-
-
... More
DISTRIBUTION SYSTEM
-
-
-
... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 50% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock.
Earth & Boulders
725.84
-
-
... More
Medium Rock
241.95
-
-
... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.
20 mm dia
350
-
-
... More
25 mm dia
2137
-
-
... More
32 mm dia
380
-
-
... More
40 mm dia
120
-
-
... More
Supply of the following fittings including cartage of materials,labours ,T.&P. etc. Complete. Wheel valves. 25 mm dia
1
-
-
... More
32 mm dia
1
-
-
... More
40 mm dia
1
-
-
... More
Supply of all materials labours T&P etc and construct Wheel/Gate Valve chamber as per type design complete.
3
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size).
10.04
-
-
... More
Cartage of following pipes special & fitting from Rishikesh to site store for proper completion of work distance upto 252.00 km pakka road & 2.50 km by head load (including GST 18%)
85.32
-
-
... More
Balance FHTC required (117-98=19)
19
-
-
... More
SUPPLY MAIN & DISTRIBUTION
Testing of Pipe (5000.00 + 18.00%)
6
-
-
... More
Water Testing
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements