Uttarakhand Jal Sansthan Tender
View complete overview of Uttarakhand UJS Tender
Uttarakhand Jal Sansthan - UJS Tender
Civil And Construction
Eprocure
Opening Date28 Nov 2022
Closing Date9 Dec 2022
Tender AmountRefer Documents
Costs
EMD
₹ 1,22,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UKJS_52092_1Bid Award Id
ViewTender No
1422/E-Nivida/2022-23 Dated 24.11.2022Tender Authority
Uttarakhand Jal Sansthan ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dismantling of bridle c.c path inside the village and streat including disposal as per requirement in direction of engneer-in-charge
15
-
-
... More
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.
G.I. Medium quality
15mm dia
2000
-
-
... More
20mm dia
2000
-
-
... More
25mm dia
500
-
-
... More
32mm dia
3000
-
-
... More
40mm dia
4500
-
-
... More
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50.00m but excluding the cost of earth work
20mm dia
900
-
-
... More
25mm dia
600
-
-
... More
32mm dia
400
-
-
... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60m. From trenches including supply of labour, T&P. etc complete. Assuming that 90% pipe line is laid in trenches ,it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and rest 25%will be in soft rock
Soil mixed with boulder and bajri
3377.7
-
-
... More
Soft rock
1125.9
-
-
... More
Relaying of dismantled G.I.Pipe in true alignment in trenches including supply of all materials,labour,T&P etc. complete.
20mm dia
900
-
-
... More
25mm dia
600
-
-
... More
32mm dia
400
-
-
... More
Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. complete
Gate valves/Sluice valves (Class-I)as per I S 788/1997
32mm dia
4
-
-
... More
40mm dia
4
-
-
... More
Supply of all materials,labours ,T.&P. etc. and making ferrule connection to provide FHTC to the consumers under JJM complete (assuming average 20.00m length for a single connection)
20
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
4.05
-
-
... More
RR stone masonary with 1:6 cement and sand mortar nearby sources and along the pipe line for proper completion of work.
19.56
-
-
... More
RR stone masonary laid in dry for proper completion of work along the pipe line.
8.64
-
-
... More
R.C.C. 1:1.5:3 cement, coarse sand & 20mm gauge gravel in wall & dome excluding supply of reinforcement steel & its bending but including fixing in position with 20BWG
0.72
-
-
... More
Mild steel work in RCC 1:1.5:3 cement concrete @ 1.00% of whole concrete work.
78.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements