Uttarakhand Jal Sansthan Tender

View complete overview of Uttarakhand UJS Tender

Uttarakhand Jal Sansthan - UJS Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date10 Jul 2024
Closing Date24 Jul 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
50 mmφ

1000

-

-

... More
40 mmφ

2000

-

-

... More
Supply of special & fittings 5% of Pipe cost

1

-

-

... More
S/F of Steel Intake Chamber

1

-

-

... More
Excavation of earth for pipe line in following strata lift upto 30 M. including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 M. from trenches including suply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shigle, bajri and boulders and rest 25% will be in medium rocks. Soil mixed with boulders and bajri

3830.4

-

-

... More
Medium rocks

798.63

-

-

... More
Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. GI Pipe 80 mm

4000

-

-

... More
GI Pipe 65 mm

12000

-

-

... More
GI Pipe 50 mm

1000

-

-

... More
GI Pipe 40 mm

2000

-

-

... More
Construction of S.C.P.C. Drain, including supply of all materials, labour T&P etc. complete

15

-

-

... More
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge.

97.5

-

-

... More
Random Rubble Masonary laid dry in breast wall,retaining wall, parapets, scupper etc. Including supply of all materials, labour, T& P & royality etc, required for proper complition of work. (As per PWD Uttarakhand specifications)

207

-

-

... More
Random Rubble Masonary laid in 1:6 cement and sand mortar, in breast wall,retaining wall, parapets, scupper etc. Including supply of all materials, labour, T& P & royality etc, (As per PWD Uttarakhand specifications)

92.7

-

-

... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1.5mX1.5m with two diaphragms at 1m interval, having mesh opening 100mmx120mm, mesh wire diameter 2.7mm/3.7mm, dge/selvedge wire diameter 3.9mm and lacing wire diameter 2.2mm. (The work includes filling boulders in the gabions).

54

-

-

... More
Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-in-charge.

112.5

-

-

... More
Construction of following RCC CWR, including supply of all materials, labour T&P etc. complete RCC CWR 120 KL

1

-

-

... More
Concrete with cement, coarse sand and 20 mm gauge stone ballast in proportion 1:2:4 (Hand mixed) in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications.PCC 1:2:4 (Hand mixed)

4.02

-

-

... More
Provision of Photography

3

-

-

... More
Cartage of material like steel pipe etc complete

1311.73

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.