Uttarakhand Jal Sansthan Tender

Calculate bid estimation of Uttarakhand UJS Tender

Uttarakhand Jal Sansthan - UJS Tender

Goods
Civil And Construction
Excavation
Machinery and Tools
Eprocure
Opening Date5 Mar 2025
Closing Date8 Apr 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Drilling of bore following sizes by heavy duty percussion Rig machine (Telescopic Method) in alluvial, boulders, pebbles, rocky stone,sticky clay etc from ground level upto entire depth using by 600/550/500/450/400 mm casing pipes as below. (i) 600/550/500 mm dia bore from GL to 50 m BGL

50

-

-

... More
(ii) 450 mm dia bore from 50 m to 100 m BGL

50

-

-

... More
(iii) 400 mm dia bore from 100 m to 150 m BGL

50

-

-

... More
Lowering of different size of casing pipes in drilled and lined bore as below (i) Lowering of 500/450 mm Dia casing pipe (a) from GL to 50 m BGL

50

-

-

... More
(ii) Lowering of 400 mm Dia casing pipe (a) from GL to 100 m BGL

100

-

-

... More
Extraction of different size of casing pipe from bottom to GL as below (i) Extraction of 400mm dia casing pipe from 150 m BGL to 100 m BGL

50

-

-

... More
(ii) Extraction of 500/450mm dia casing pipe from 150 m BGL to 50 m BGL

50

-

-

... More
(iii) Extraction of 600/550/500mm dia casing pipe from 50 m BGL to GL

50

-

-

... More
Lifting of different size of casing pipe in drilled lined bore as below (i) Lifting of 400mm dia casing pipe from 100 m BGL to GL as below

100

-

-

... More
(ii) Lifting of 500/450mm dia casing pipe from 50 m BGL to GL as below

50

-

-

... More
Procurement of TW assembly as below (i) 300 mm dia MSERW pipe 7.90mm thick (a) Blind & Threaded

120

-

-

... More
(b) Slotted & threaded

30

-

-

... More
(ii) 300 mm Dia Bail Plug

1

-

-

... More
(iii) 300 mm Dia MS well cap

1

-

-

... More
(iv) 300 mm Dia MS clamp with nuts & bolts

1

-

-

... More
(v) Supply of pea gravel of size 1.6 mm to 4.8 mm

80

-

-

... More
(vi) Surrounding of pea Gravels in between bore and tubewell assembly upto entire depth of tubewell ordered by the department

150

-

-

... More
Lowering of TW assembly as below (i) preparing & Lowering of tubewell assembly starting from GL to the required depth including cutting welding as per required at site complete with all T&P (a) 300 mm dia MS ERW pipe (plain & Slotted)as required

150

-

-

... More
Dismantling of heavy duty percussion Rig machine & other equipments and clearance of site after finishing the job.

1

-

-

... More
Development of T/W by 350 PSI/1400 CFM air compressor unit to the satisfaction of Engineering in charge to give sand free discharge and proper packing of pea Gravels at least for 70 Hrs

100

-

-

... More
Development of T/W by the suitable submersible OP units complete with Lowering and lifting of pumping plant having 2000 LPM discharge approximate including running of OP unit and weld testing of tubewell by V Notch atleast for 60 Hrs to the satisfactory completion of work

60

-

-

... More
RATES OF THE DRILLING & DEVELOPMENT OF TUBE WELLS BY HEAVY DUTY DIRECT ROTARY RIG MACHINE IN DISTRICT DEHRADUN. (150 meter Deep) Schedule A-2

-

-

-

... More
Transportation of suitable truck mounted rig machine, air compressor, OP unit, camp equipage ,connected T&P and necessary accessories, casing pipe ,tube well assembly housing pipe etc including loading, unloading creation and leveling of rig machine upto site of work etc complete in all respect as per direction of Engineer in charge required for drilling and development of TW

1

-

-

... More
(i) Erection & Leveling of rig machine at site of work

1

-

-

... More
Drilling of 550 mm dia bore by heavy duty direct rotary Rig machine in alluvial, boulders, pebbles, rocky stone, sticky clay etc from ground level upto entire depth for 300 mm dia linear assembly

150

-

-

... More
Procurement of TW assembly as below (i) 300 mm dia MSERW pipe 7.90mm thick (a) Blind & Threaded

120

-

-

... More
(b) Slotted & threaded

30

-

-

... More
(ii) 300 mm Dia Bail Plug

1

-

-

... More
(iii) 300 mm Dia MS well cap

1

-

-

... More
(iv) 300 mm Dia MS clamp with nuts & bolts

1

-

-

... More
(v) Supply of pea gravel of size 1.6 mm to 4.8 mm

80

-

-

... More
(vi) Surrounding of pea Gravels in between bore and tube well assembly upto entire depth of tube well ordered by the department

150

-

-

... More
Preparing & lowering of tube well assembly starting from G.L. to the required depth including cutting, welding as required at site complete with all T&P required. (i) Fixing of 300 mm dia bail plug with Nut & U-bolt.

1

-

-

... More
(ii) Lowering of 300 mm dia MSERW housing pipe (Plain & Slotted pipe) as required.

150

-

-

... More
(iii) Fixing of 300 mm dia, 8 mm thick tube well cap.

1

-

-

... More
(iv) Fixing of 300 mm dia M.S.D.I. housing clamp.

1

-

-

... More
Dismantling of Rig Machine & Clearance of site after satisfactory completion of work.

1

-

-

... More
Development of T/W by 350 PSI/1400 CFM air compressor unit to the satisfaction of Engineering in charge to give sand free discharge and proper packing of pea Gravels at least for 70 Hrs.

100

-

-

... More
Development of T/W by the suitable submersible OP units complete with Lowering and lifting of pumping plant having 2000 LPM discharge approximate including running of OP unit and weld testing of tube well by V Notch atleast for 60 Hrs to the satisfactory completion of work.

60

-

-

... More
RATES OF THE DRILLING & DEVELOPMENT OF TUBE WELLS BY HEAVY DUTY DUAL ROTARY RIG MACHINE IN DISTRICT DEHRADUN. (150 meter Deep) Schedule A-3

-

-

-

... More
Transportation of suitable truck mounted rig machine, air compressor, OP unit, camp equipage ,connected T&P and necessary accessories, casing pipe ,tube well assembly housing pipe etc including loading, unloading creation and levelling of rig machine upto site of work etc complete in all respect as per direction of Engineer in charge required for drilling and development of TW (i) For plain Area

1

-

-

... More
(ii) Erection & Leveling of rig machine at site of work

1

-

-

... More
Drilling of bore following sizes by heavy duty dual rotary Rig machine (Telescopic Method) in alluvial, boulders, pebbles, rocky stone,sticky clay etc from ground level upto entire depth using by 600/550/500/450/400 mm casing pipes as below. (i) 600/550/500 mm dia bore from GL to 50 m BGL

50

-

-

... More
(ii) 450 mm dia bore from 50 m to 100 m BGL

50

-

-

... More
(iii) 400 mm dia bore from 100 m to 150 m BGL

50

-

-

... More
Lowering of different size of casing pipes in drilled and lined bore as below (i) Lowering of 500/450 mm Dia casing pipe (a) from GL to 50 m BGL

50

-

-

... More
(ii) Lowering of 400 mm Dia casing pipe (a) from GL to 100 m BGL

100

-

-

... More
Extraction of different size of casing pipe from bottom to GL as below (i) Extraction of 400mm dia casing pipe from 150 m BGL to 100 m BGL

50

-

-

... More
(ii) Extraction of 500/450mm dia casing pipe from 150 m BGL to 50 m BGL

50

-

-

... More
(iii) Extraction of 600/550/500mm dia casing pipe from 50 m BGL to GL

50

-

-

... More
Lifting of different size of casing pipe in drilled lined bore as below (i) Lifting of 400mm dia casing pipe from 100 m BGL to GL as below

100

-

-

... More
(ii) Lifting of 500/450mm dia casing pipe from 50 m BGL to GL as below

50

-

-

... More
Procurement of TW assembly as below (i) 300 mm dia MSERW pipe 7.90mm thick (a) Blind & Threaded

120

-

-

... More
(b) Slotted & threaded

30

-

-

... More
(ii) 300 mm Dia Bail Plug

1

-

-

... More
(iii) 300 mm Dia MS well cap

1

-

-

... More
(iv) 300 mm Dia MS clamp with nuts & bolts

1

-

-

... More
(v) Supply of pea gravel of size 1.6 mm to 4.8 mm

80

-

-

... More
(vi) Surrounding of pea Gravels in between bore and tubewell assembly upto entire depth of tubewell ordered by the department

150

-

-

... More
Lowering of TW assembly as below (i) preparing & Lowering of tubewell assembly starting from GL to the required depth including cutting welding as per required at site complete with all T&P (a) 300 mm dia MS ERW pipe (plain & Slotted)as required

150

-

-

... More
Dismantling of heavy duty percussion Rig machine & other equipments and clearance of site after finishing the job.

1

-

-

... More
Development of T/W by 350 PSI/1400 CFM air compressor unit to the satisfaction of Engineering in charge to give sand free discharge and proper packing of pea Gravels at least for 70 Hrs

100

-

-

... More
Development of T/W by the suitable submersible OP units complete with Lowering and lifting of pumping plant having 2000 LPM discharge approximate including running of OP unit and weld testing of tubewell by V Notch atleast for 60 Hrs to the satisfactory completion of work

60

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.