Uttarakhand Cooperative Dairy Federation Limited Tender

View complete overview of Uttarakhand UCDF Tender

Uttarakhand Cooperative Dairy Federation Limited - UCDF Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date12 Sep 2022
Closing Date26 Sep 2022
Tender Amount₹ 35,00,000 
Notes
Download

Costs

Summary

Construction Of Retaining Wall, Boundary Wall And C.c.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6

75.45

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) P.C.C. grade M 20.Nominal mix (1:2:4)

13.58

-

-

... More
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C grade M 15(1:2:4)

16.86

-

-

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 20 For nominal mix 1:2:4

8.56

-

-

... More
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

1410.99

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & In 1:4 cement mortar technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry

277.3

-

-

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 In 1:5 cement mortar

174.11

-

-

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

1440

-

-

... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203

18.38

-

-

... More
Cement Concrete (PCC M-30) Pavement:- Construction of Unreinforced, Cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including leveling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications.

21

-

-

... More
Centring and shuttering including strutting,ropping etc. and removal of form for Centring and shuttering including strutting,ropping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete.

193.89

-

-

... More
Finishing walls with Premium Acrylic Smooth Exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm).

1440

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.