Uttarakhand Agricultural Produce Marketing Board Tender
View complete overview of Uttarakhand UKAPMB Tender
Uttarakhand Agricultural Produce Marketing Board - UKAPMB Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date3 Oct 2022
Closing Date10 Oct 2022
Tender Amount₹ 1,31,94,000
Costs
EMD
₹ 2,64,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UAPMB_50233_1Bid Award Id
ViewTender No
e-nivida -39/2022Tender Authority
Uttarakhand Agricultural Produce Marketing Board ViewPurchaser Address
-Website
http://https://www.ukapmb.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). D.S.R. CODE 5.1.2
118.33
-
8644.44
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :.1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). D.S.R. CODE 5.2.2
45
-
10422.72
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) D.S.R. CODE 6.1.2
46.67
-
6896.34
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) D.S.R. CODE 6.4.2
201.67
-
8501.3
... More
Reinforcement for R.C.C work including straighting,cutting,bending ,placing in position and bending all complete TMT D.S.R. CODE 5.22.6
13833.33
-
93.52
... More
15mm thick plaster on the plain in side of mix 1:6 mortor D.S.R. CODE 13.2.2
2100
-
327.99
... More
Finishing walls with Premium Acrylic Smooth exterior paint with
Silicone additives of required shade:
13.47.1 New work (Two or more coats applied @ 1.43 ltr/10 sqm
over and including priming coat of exterior primer applied
@ 2.20 kg/10 sqm) D.S.R. CODE 13.47.1
2100
-
180.49
... More
Centering shuttering including strutting, propping etc. and removal of form work FOUNDATION UP TO PLINTH D.S.R 5.9.1
420
-
319.03
... More
Centering shuttering including strutting, propping etc. and removal of form work COL SUPER STRUCTURE D.S.R 5.9.6
683.33
-
821.74
... More
Centering shuttering including strutting, propping etc. and removal of form work Beams D.S.R 5.9.7
420
-
697.03
... More
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth S.O.R. 11-1-1-1 (MORD)
198
-
427.06
... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 S.O.R. 2-2 (MISCELLANEOUS)
33
-
5686.46
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction 1-3 (MISCELLANEOUS)
159
-
2367.12
... More
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
6
-
8816.08
... More
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth S.O.R. 11-1-1-1 (MORD)
216
-
427.06
... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 S.O.R. 2-2 (MISCELLANEOUS)
36
-
5686.46
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction 1-3 (MISCELLANEOUS)
327
-
2367.12
... More
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
6
-
8816.08
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. S.O.R 11-1-1-1 MORD
367.5
-
427.06
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. S.O.R. 4-1-A-2 MORD
105
-
2539.04
... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work.(Based on PWD specifications)S.O.R 2-2 MISC
105
-
5686.46
... More
Cement Concrete (PCC M-30) Pavement:-
Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications. S.O.R 2-3 MISC
157.5
-
10231.87
... More
Excavation in Hilly Areas in means not requiring blasting Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. Ordinary Rock S.O.R. MORD 8-3-4
225
-
210.56
... More
Excavation in Hilly Areas in means not requiring blasting Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. Hard Rock requiring blasting 20% S.O.R. MORD 8-3-5-A
90
-
357.5
... More
Excavation in Hilly Areas in Soil by mechanical means S.O.R. MORD 8-3-1-A
135
-
266.9
... More
Construction of Embankment with Material btained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause S.O.R. MORD 3 -3
222
-
76.94