Uttarakhand Agricultural Produce Marketing Board Tender

View complete overview of Uttarakhand UKAPMB Tender

Uttarakhand Agricultural Produce Marketing Board - UKAPMB Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date19 Dec 2023
Closing Date28 Dec 2023
Tender Amount₹ 36,08,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).

27.56

317091

11505.5

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).5.2.2

11.34

123072

10852.95

... More
Centring and shuttering including strutting,ropping etc. andremoval of form for for foundations, footings, bases of columns, etc. for mass concrete. 5.9.1

150.5

59018

392.15

... More
Centring and shuttering including strutting,ropping etc. andremoval of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers 5.9.5

157.5

115983

736.4

... More
Centring and shuttering including strutting,ropping etc. andremoval of form for Columns, Pillars, Piers, Abutments, Posts and Struts. 5.9.6

134.4

129198

961.3

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) 6.1.2

77.5

552749

7132.25

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : 6.4.2

53.52

487350

9105.95

... More
Reinforcement for R.C.C. work including straightening, cutting,bending, placingin position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more. 5.22.6

7684.07

828726

107.85

... More
12 mm cement plaster of mix 1:4(1 cement : 6 coarse sand) 13.4.1

357

127573

357.35

... More
15 mm cement plaster of mix 1:6 (1 cement : 6 coarse sand)13.5.2

357

141139

395.35

... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied@ 2.20 kg/10 sqm) 13.47.1

714

122165

171.1

... More
Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete10.1

2.36

27694

11735

... More
Fencing with R.C.C. post placed at required distance, metre embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire 9.38 kg per 100 metres (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire 16.17

840

11760

14



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.