Uttarakhand Agricultural Produce Marketing Board Tender
View complete overview of Uttarakhand UKAPMB Tender
Uttarakhand Agricultural Produce Marketing Board - UKAPMB Tender
Civil And Construction
Road Construction
Excavation
Eprocure
Opening Date25 Feb 2023
Closing Date15 Mar 2023
Tender Amount₹ 29,17,000
Costs
EMD
₹ 58,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UAPMB_55466_1Bid Award Id
ViewTender No
e-nivida -86/2023Tender Authority
Uttarakhand Agricultural Produce Marketing Board ViewPurchaser Address
-Website
http://https://www.ukapmb.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement Concrete (PCC M-30) Pavement:-Construction of Un-reinforced, Cement concrete pavement, thickness asper design, over a prepeared sub base with 43 grade cement or any othertype PCC Grade M-30, coarse and fine aggregates conforming to IS: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed inaconcrete mixer of not less then 0.2 cum capacity and appropriate weighbatcher using approved mix design, laid in approved fixed side formwork(Steel channel, laying and fixing of wedges, steel plates including levellingthe formwork and laying and fixing of 125 micron thick polythene film, asper drawing), spreading the concrete with shovels, rakes, compacted usingneedle, and plate vibrators, finished in continuous operation and curing ofconcrete slabs for 14 days, using curing compound where specified andwater finishing to lines and grade as per drawings and technicalspecifications. 2-3 MISCE
157.61
1095179
6948.67
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as pertechnical specification Clauses 613.4 & 1204 173.70 Sqm 12-3 MORD
297
65081
219.13
... More
Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with alift upto 1.5 m, transporting to site, spreading, grading to required slope andcompacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 mas per Technical Specification Clause 301.5 3-4 MORD
415.8
309596
744.58
... More
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring gravel 4-11-1
49.84
81441
1634.06
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements