Uttarakhand Agricultural Produce Marketing Board Tender
View complete overview of Uttarakhand UKAPMB Tender
Uttarakhand Agricultural Produce Marketing Board - UKAPMB Tender
Civil And Construction
Building Construction
Eprocure
Opening Date29 Jan 2024
Closing Date6 Feb 2024
Tender Amount₹ 31,75,840
Costs
EMD
₹ 75,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UAPMB_68459_2Bid Award Id
ViewTender No
E-Niveda1302Tender Authority
Uttarakhand Agricultural Produce Marketing Board ViewPurchaser Address
-Website
http://https://www.ukapmb.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Reinforced cement concrete work in walls (any thickness), includingattached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up tofloor five level, excluding cost of centering, shuttering, finishing andreinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stoneaggregate 20 mm nominal size). 5.2.2
29.53
303889
10290.87
Centering and shuttering including strutting, propping etc. and removalof form for all heights :5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
48.6
15309
315
Centering and shuttering including strutting, propping etc. and removalof form for all heights :Lintels, beams, plinth beams, girders, bressumers and cantilevers 5.9.5
110.42
67408
610.47
Centering and shuttering including strutting, propping etc. and removalof form for all heights : Suspended floors, roofs, landings, balconies and accessplatform 5.9.3
161.66
123896
766.4
Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts 5-9-6
92.47
75025
811.35
Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in superstructure above plinth level up to floor V level inall shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) 6.4.1
46.2
398970
8635.72
Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering, shuttering,finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).5.3
30.99
334602
10797.12
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars 5.22.1
47.51
431337
9078.88
Providing wood work in frames of doors, windows, clerestory windowsand other frames, wrought framed and fixed in position with hold fastlugs or with dash fasteners of required dia & length ( hold fast lugs ordash fastener shall be paid for separately).teak wood cum 92743.059.1.2
0.03
3494
116474.19
Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gatesand similar works 10.25.2
8.5
123134
14486.4
Supplying and fixing rolling shutters of approved make, made of requiredsize M.S. laths, interlocked together through their entire length andjointed together at the end by end locks, mounted on specially designedpipe shaft with brackets, side guides and arrangements for inside andoutside locking with push and pull operation complete, including thecost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strengthconforming to IS: 4454 - part 1 and M.S. top cover of required thicknessfor rolling shutters 80x1.25 mm M.S. laths with 1.25 mm thick top cover .10.6.1
32.4
105484
3255.68
Providing and fixing ball bearing for rolling shutters 10.7
10
4642
464.28
Extra for providing mechanical device chain and crank operation foroperating rolling shutters. Exceeding 10.00 sqm and upto 16.80 sqm in the area 10.8.1
32.4
39646
1223.66
Providing and fixing M.S. grills of required pattern in frames of windowsetc. with M.S. flats, square or round bars etc. including priming coatwith approved steel primer all complete. Fixed to steel windows by welding 9.48.1
1.14
20838
18279.4
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) 13.1.2
480.97
135229
281.16
Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floatingcoat of neat cement. 12 mm cement plaster 13.9.1
170
65825
387.21
Providing and applying plaster of paris putty of 2 mm thickness overplastered surface to prepare the surface even and smooth complete 13.26
482.11
104868
217.52
Distempering with oil bound washable distemper of approved brandand manufacture to give an even shade : New work (two or more coats) over and including waterthinnable priming coat with cement primer 13.41.1
481.32
81675
169.69
Finishing with Deluxe Multi surface paint system for interiors andexteriors using Primer as per anufacturers specifications :Two or more coats applied on walls @ 1.25 ltr/10 sqmover and including one coat of Special primer applied @0.75 ltr /10 sqm 13.48.1
127.14
19992
157.25
Providing and fixing glazed shutters for doors, windows and clerestorywindows using 4 mm thick float glass panes, including ISI marked M.S.pressed butt hinges bright finished of required size with necessaryscrews.Kiln seasoned and chemically treated hollock wood 35 mm thick 9.9.2.1
2.54
8289
3263.7
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 gradedstone aggregate) finished with a floating coat of neat cement, includingcement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate 11.3.1
48.97
26986
551.09
Providing edge moulding to 18 mm thick marble stone counters, Vanitiesetc., including machine polishing to edge to give high gloss finish etc.complete as per design approved by Engineer-in-Charge.8.3.1 Marble work
6.86
1671
243.67
Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stoneaggregate 20 mm nominal size) 4.1.2
19.59
156204
7973.66
Demolishing brick work manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge. In cement mortar 15.7.4
7.02
11410
1625.46
Demolishing cement concrete manually/ by mechanical meansincluding disposal of material within 50 metres lead as per directionof Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent designmix) 15.2.1
35.25
67726
1921.33
Painting Steel work with Deluxe Multi Surface Paint togive an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture 13.48.3
108.27
15061
139.11
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements