THDC India Limited Tender
View complete overview of Uttarakhand THDC Tender
THDC India Limited - THDC Tender
Solid Waste Management
Eprocure
Opening Date29 Jan 2025
Closing Date19 Feb 2025
Tender Amount₹ 1,65,88,495
Costs
EMD
₹ 3,31,800Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_THDC_846494_1Bid Award Id
ViewTender No
THDC/TEHRI/PROC/Open/ 2024-25/27Tender Authority
THDC India Limited ViewPurchaser Address
-Website
http://https://www.thdc.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20. including all material labour T&P etc. Complete
12.86
7506
96550.66
... More
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Hand mixed). including all material labour T&P etc. Complete
15
6866
102991.95
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 120. including all material labour T&P etc. Complete
1031
82
84923.47
... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
5.55
320
1777.5
... More
15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) . including all material labour T&P etc. Complete
36.6
337
12346.64
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. including all material labour T&P etc. Complete
1000
148
148520
... More
R.R stone masonary in 1:6 cement sand mortar. including all material labour T&P etc. Complete
157.02
6302
989590.29
... More
providing and laying of GI pipe nominal size 50 MM dia with fittings. including all material labour T&P etc. Complete
150
680
102055.5
... More
Gate valve 50 MM dia
4
913
3652.56
... More
PVC pipe 50 MM dia
200
964
192822
... More
Gate valve 20 MM dia
25
480
12005.5
... More
Supplying of good quality rubber pipe 1/2 inch dia for sprinkling of water
300
173
51975
... More
Fencing with angle iron post placed at required distance embedded in cement concrete blocs, every 15th post, last but one end post and corner post shall be strutted on both side only and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires of barbed wire weighting 9.38 kg per 100m(minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (cost of posts, struts, earth work and concrete work to be paid for separetely). patment to be made per meter cost of total length of barbed wire used with G.I. barbed wire
2454.86
22
56412.68
... More
Enamel paint 2 coat on new work. including all material labour T&P etc. Complete
150
136
20509.5
... More
Supplying and fixing of Tree guard . including all material labour T&P etc. Complete
1000
1852
1852310
... More
Providing and laying of soil on dumping are atleast 15 CM thick including cost of power tranportation lead upto 2.00 Km. including all material labour T&P etc. Complete
1500
745
1118565
... More
Extra for lead
-
-
-
... More
Beyond 2 Km to 5 Km
500
47
23885
... More
5 Km to 10 KM
250
118
29725
... More
10 Km to 15 KM
250
182
45562.5
... More
Watch and ward of Dumped muck about 1.50 Hect area at Chopra including watching of plants removel of unwanted plant watring and replacing new plants inplace of dead plant etc.
6
40081
240489
... More
Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge.
1000
225
225600
... More
Plantation of tree
-
-
-
... More
Boganbeliya
50
345
17297
... More
Dhaudi
25
148
3723.75
... More
Sheesam
75
230
17254.5
... More
Gulmohar
50
148
7447.5
... More
Guava
50
230
11503
... More
Mango
50
345
17297
... More
Lemon
50
230
11503
... More
Jamun
50
241
12082.5
... More
tejpata
25
230
5751.5
... More
Saicuss
50
751
37575
... More
Surai
50
148
7447.5
... More
kachnaar
25
114
2854.75
... More
Chullu
25
230
5751.5
... More
Malta
25
172
4303.25
... More
Neem
25
230
5751.5
... More
Amla kalmi
50
230
11503
... More
aaru
25
230
5751.5
... More
Laukaat
25
230
5751.5
... More
Pulam
50
148
7447.5
... More
Akhrot
25
519
12993.75
... More
sehtoot
50
148
7447.5
... More
Arjun
50
148
7447.5
... More
Anaar
50
114
5709.5
... More
Copper bottle brush
25
172
4303.25
... More
Golden bottle brush
20
172
3442.6
... More
Bamboo
100
125
12578
... More
Khumaani
20
345
6918.8
... More
Bahera
10
114
1141.9
... More
Rudraksh
20
461
9236.2
... More
Belpatri
50
148
7447.5
... More
Truffing on slope area
-
-
-
... More
Lemon grass
250
555
138975
... More
Carpet Grass
250
430
107747.5
... More
Selection -1 Grass
250
181
45290
... More
NOTE: excluding GST & EPF/ESI on employer part & Labour Cess
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements