State Infrastructure And Industrial Development Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand SIIDCUL Tender
State Infrastructure And Industrial Development Corporation Of Uttarakhand Limited - SIIDCUL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date9 Feb 2023
Closing Date6 Mar 2023
Tender AmountRefer Documents
Costs
EMD
₹ 1,10,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SIDCU_54784_1Bid Award Id
ViewTender No
90/SIIDCUL/2023Tender Authority
State Infrastructure And Industrial Development Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.siidcul.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Repair of 60watt LED street lights by replacement of damaged/diffused PCB plates 60Watt as per the site requirement including material charges but excluding labour charges. DLP 12 month.
70
-
-
Repair of 150watt LED High Mast Lights by replacement of damaged /diffused drivers 150watt as per the site requirement including material charges but excluding labour. DLP 12 month.
28
-
-
Repair of LED High Mast Lights replacing damaged/diffused PCB plates 150 Watt as per the site requirement including material charges but excluding labour. DLP 12 month.
14
-
-
Repairing of street lights / High Mast Electrical Control panel replacing 3Pole power contactor type MNX-70 including material charges but excluding labour. One in each, total 15 panels ( as per the requirement )
6
-
-
Repairing of street lights / High Mast Electrical Control panel replacing Timer Auto Light including material charges but excluding labour. One in each, total 15 panels ( as per the requirement)
6
-
-
Repairing of street lights / High Mast Electrical Control panel replacing 3pole MCCB,100Amp including material charges but excluding labour. One in each, total 15 panels ( as per the requirement )
6
-
-
Repairing of street lights / High Mast Electrical Control panel replacing Isolator 4way 40 Amps including material charges but excluding labour. Six in each, total 15 panels as per the requirement
24
-
-
Replacing the burnt/damage pvc 1.5 sqmm single core wire by required size of weather proof cable excluding labour as per the requirement
3240
-
-
Supply &Laying of one number PVC insulated and PVC sheathed / xlpe power cable 1.1 kv grade of size up to 35 sqmm direct in ground including excavation , sand cushioning , protective covering and refilling the trench etc as required . (DSR no. 7.1.1)
500
-
-
Supply of 60 watt LED Street Lights for replacement of Old damage LED lights Make- Phillips/Havells/Crompton
100
-
-
Supply of Aerial Bunch Cable 4x35 sqmm( as per the site requirement) including material for laying of the cables on poles excluding labour charges as per the requirement.
500
-
-
Erection of metallic pole 8mtr to 11 mtr (10mtrs)Height, in cement concrete 1:3:6 foundation including excavation and refilling etc Including labour and Material. ( DSR 11.3.3) ( as per the requirement raised by Engineer-IN charge)
30
-
-
Pole Painting (inclduing surface cleaning and primer coat) with Numbering on Poles ( As per the site requirement ) including material and labour charges
1000
-
-
Earthing with G.I. earth plate 600mmx600mmx6mm thick inclduing accessories and providing masonary enclosure with cover plate having locking arrangement and watering pipe of 2.7mtrs long etc with charcoadl coke and salt as required ( as per DSR 5.4)
12
-
-
Supplying and laying 25mm x 5mm GI strip at 0.50 meter below grouns as strip earth electrode, including connection/terminating with G.I. nut,bolt,spring, washer etc as required. (jointing shall be done by overlapping and with 2 sets of GI nut bolt & spring washer spaced at 50mm
10
-
-
Annual Maintenance of Transformer installed for Main supply of Street Lights inclduing Dehydration of transformer Oil, OTI / WTI Calibration etc.( once in year )
1
-
-
Annual Maintenance of DG sets installed at SIIDCUL offices or for street light's Back Up energy inclduing material and Labour. ( 01 service per year )
1
-
-
Annual Maintenance of Servo Panel installed at SIIDCUL Water Tank for street light's Back Up energy inclduing material and Labour.( Once in year)
1
-
-
Annual Maintenance / Servicing of Air Conditioners ( Ductable / Window/Split ) installed at SIIDCUL offices including labour and material by repair of 2nos of PCB card on each of 2.5T & 5.5 / 8.5T ( total 02nos ) ,by replacement of compressor one each of 2.5T & 5.5T and 8.5T ( total 3nos) , repair of total 03nos of Fan Motor one each of 2.5t & 5.5T and 8.5T ( total 3nos)with R-22 Gas refill ( Total AC capacity is 78.8 TR)
1
-
-
Comprehensive Annual Maintenance of 20KVA UPS (Eaton Make) with replacement of 28nos battery bank of 1.8volt installed at SIIDCUL Offices including labour and material.(Once in a year)
1
-
-
Repair of 25 HP submersible motor, winding, rotor grinding and rotor balancing complete in all respect including lowering and lifting , labour & Material ( as per requirement )
3
-
-
Repairing of 25HP submersibile pump by repair/ replacement of pump-bush, sleeves, necking etc. complete in all respect inclduing labour & material. ( as per requirement )
3
-
-
Labour work for lifting, lowering, column pipe following size with motor & pump and cartage complete.
6
-
-
Supply of 25 HP Fully Automatic Star-Delta Oil Immersed Motor Starter with Extra long life contact for replacement of non working Motor Startor but excluding labour. One in each ( as per the requirement)
4
-
-
Rewinding & Repairing of water supply 40HP Motor with taking out and fixing in position complete in all respect inclduing material and Labour charges.
2
-
-
Rewinding 40HP Centrifugal pump by grinding work, replacing of bearing, re-fillinf of glands, lathe works etc.
2
-
-
Repairing of 40 HP Water Supply Motor Electrical Control panel replacing 3Pole power contactor type MNX-40 including material charges but excluding labour. ( as per the requirement)
3
-
-
Rewinding of 40HP Pump Motor electrical control panel by replacing timer including material charges but excluding labour chrges. 3 in each panel. Total 01 panel (as per site requirement)
2
-
-
Rewinding of 40HP Pump Motor electrical control panel by replacing 3 pole 100 amp MCCB including material charges but excluding labour chrges. 1 in each panel. Total 01 panel (as per site requirement)
2
-
-
Rewinding of 40HP Pump Motor electrical control panel by replacing HRC Fuse 160 amp including material charges but excluding labour chrges. 9 in each panel. Total 01 panel (as per site requirement)
6
-
-
Rewinding of 40HP Pump Motor electrical control panel by replacing HRC Fuse 250 amp including material charges but excluding labour chrges. 9 in each panel. Total 01 panel (as per site requirement)
3
-
-
Supply of electric cable for power supply to submersible motor pump complete in all respect including material & labour charges. (sice 3 X 6 Sqmm)
150
-
-
MS pipe grade C 4 inch dia with outer threading 10 ft length with socket for water supply
10
-
-
Supply of 150 watt LED Street Lights for replacement of Old damage LED lights Make- Phillips/Havells/Crompton
28
-
-
Replacement of old rusted/ damaged pole by new steel tubular pole 9.50 Metre long designated 410 SP-39 in 1:3:6 cement concrete foundation including excavation back filling etc. complete in allrespect.(UPPWD SOR No.619)
10
-
-
Repairing of street lights / High Mast Electrical Control panel replacing 3pole MCCB,250 Amp including material charges but excluding labour. One in each, total 03 panels ( as per the requirement )
3
-
-
Insulating Tape, Multimeter, Hand Gloves, Aluminum Jointing Pipe 35 Sqmm , Aluminum lux 35 Sqmm, Wooden ladder
1
-
-
Annual Maintenance and repaire of AMF Panel installed at SIIDCUL water tank for street light back up energy including material and labor charges. ( once in year )
1
-
-
Supply of Trasnformer Oil for transformer Top up including material and labour charges
200
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements