State Infrastructure And Industrial Development Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand SIIDCUL Tender

State Infrastructure And Industrial Development Corporation Of Uttarakhand Limited - SIIDCUL Tender

Services
Eprocure
Opening Date6 Aug 2020
Closing Date25 Aug 2020
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

O And M Electrical Infrastructure Iie Kotdwar

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repair of 60watt LED street lights by replacement of damaged/diffused PCB plates 60Watt Make-C&S., Phillips, Havells, Bajaj ( as per the site requirement) including material charges but excluding labour charges for Sigaddi growth center. DLP 6 Months.

20

-

790.83

... More
Repair of 90watt LED street lights by replacement of damaged/diffused drivers 90Watt Make-C&S., Phillips, Havells, Bajaj ( as per the site requirement) including material charges but excluding labour charges .60nos for IA-jashodharpur & 10nos for IA-Balbhadarpur ( Total 70nos).DLP 6 Months.

70

-

1745.28

... More
Repair of 90watt LED street lights by replacement of damaged/diffused PCB plate 90Watt Make-C&S., Phillips, Havells, Bajaj ( as per the site requirement) including material charges but excluding labour charges .20nos for IA-jashodharpur & 03nos for IA-Balbhadarpur ( Total 23nos).DLP 6 Months.

23

-

939.9

... More
Repair of 150watt LED High Mast Lights by replacement of damaged /diffused drivers 150watt Make -C&S., Phillips, Havells, Bajaj ( as per the site requirement ) including material charges but excluding labour total 2nos for Sigaddi Growth center, 02nos for IA-Jashodharpur & 2nos for IA-Balbhadarpur Total 06nos. DLP 6 Months.

6

-

1181.7

... More
Repair of 150Watt LED High Mast Lights replacing damaged/diffused PCB plates 150 Watt Make -C&S., Phillips, Havells, Bajaj ( as per the site requirement ) including material charges but excluding labour total 08nos for Sigaddi Growth center, 08nos for IA-Jashodharpur & 08nos for IA-Balbhadarpur Total 06nos. DLP 6 Months.

24

-

2027.07

... More
Repairing of street lights / High Mast Electrical Control panel by replacing 3 pole Power Contactor type MNX-70 CAT pt- CS97076including material charges but excluding labour. ( as per the requirement informed by the Engineer -Incharge) total 01nos for Sigaddi Growth center, 04nos for IA-Jashodharpur & 01nos for IA-Balbhadarpur Total 06nos ( as per Engineer In-charge). DLP 6 Months.

6

-

5431.68

... More
Repairing of street lights / High Mast Electrical Control panel by replacing Timer Auto Light CAT pt- TA916422 including material charges but excluding labour. ( as per the requirement informed by the Engineer -Incharge) total 01nos for Sigaddi Growth center, 04nos for IA-Jashodharpur & 01nos for IA-Balbhadarpur Total 06nos ( as per Engineer In-charge).

6

-

2692.22

... More
Repairing of street lights / High Mast Electrical Control panel by replacing 3 Pole MCCB 100 amp type DNO-100C including material charges but excluding labour. ( as per the requirement informed by the Engineer -Incharge) total 01nos for Sigaddi Growth center, 04nos for IA-Jashodharpur & 01nos for IA-Balbhadarpur Total 06nos ( as per Engineer In-charge).

6

-

4553.46

... More
Repairing of street lights / High Mast Electrical Control panel by replacing isolator 2 way 40 amps including material charges but excluding labour. ( as per the requirement informed by the Engineer -Incharge ) total 04nos for Sigaddi Growth center, 16nos for IA-Jashodharpur & 04nos for IA-Balbhadarpur Total 18nos ( as per Engineer In-charge)

24

-

326.19

... More
Replacing the burnt/damage pvc 1.5 sqmm two core wire by required size of weather proof 2/3 core cable excluding labour. ( as per the requirement) for Sigaddi Growth center

150

-

46.05

... More
Replacing the burnt/damage pvc 3 X 1.5 sqmm wire by required size of weather proof 2/3 core cable excluding labour. ( as per the requirement) 500mtrs for IA-Jashodharpur & 82mtrs for IA-Balbhadarpur Total 582mtrs

582

-

57.36

... More
Supply of PVC xlpe power cable 1.1 kv grade 2x 10 sqmm excluding labour for Sigaddi Growth Center

150

-

54.94

... More
Supply of PVC xlpe power cable 1.1 kv grade 04 x 16 sqmm excluding labour 100mtrs for Jashodharpur and 100mtrs for Balbhadarpur , Total 200mtrs

200

-

130.08

... More
Laying of one number PVC insulated and PVC sheathed / xlpe power cable 1.1 kv grade of size up to 35 sqmm direct in ground including excavation , sand cushioning , protective covering and refilling the trench etc as required 100mtrs for Jashodharpur and 100mtrs for Balbhadarpur , Total 200mtrs (DSR no. 7.1.1)

200

-

264.86

... More
Installation of plate on Pole for numbering of poles( As per the site requirement ) including material and labour charges for Sigaddi Growth center.

160

-

246

... More
Erection of metallic pole 8mtr to 11 mtr (10mtrs)Height, in cement concrete 1:3:6 foundation including excavation and refilling etc Including labour and Material. ( DSR 11.3.3) 05nos for Jashodharpur and 03nos for Balbhadarpur , Total 08nos

8

-

5168.46

... More
Wages /Labour charges for Electricians to be depute at respective Industrial estates of SIIDCUL for O&M work (for 8months)

1

-

116453.92

... More
Wages /Labour charges for Helpers to be depute at respective Industrial estates of SIIDCUL for O&M work ( for 8months)

1

-

76220.32

... More
Annual Maintenance of 10KVA ,DG sets installed at SIIDCUL offices inclduing material and Labour ( 01 services per year )

1

-

16876.27

... More
Operation and Maintenance of Water Supply System:O&M of Water Supply System at SIIDCUL inclduing wages for 01no Plumber & 01no helper with Chlorionation (Supply of Bleaching powder and required) valve operation, maintenance of rising main and distribution system with all works complete ( for 8months ) for Siggadi Growth Center

1

-

30730.05

... More
Repairing and Rewinding of 62HP submercible tubewell motor complete in all respect including labour & material for Sigaddi growth center

1

-

29347.8

... More
Lifting work of 62HP damaged submerciable motor from borewell and lowering of spare submericble motor & pump in available at pump house in borewell at Sigaddi growth center.

1

-

14064.64

... More
Repairing of 62HP submersibile pump by repair/ replacement of pump-bush, sleeves, necking etc. complete in all respect inclduing labour & material. ( as per requirement )

1

-

15187.22

... More
Rewinding & repairing of water supply 20HP motor with taking out for repair and fixing back on place after repairing complete in all respect including material and labour charges at Sigaddi growth center

2

-

10000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.