Rural Engineering Service Tender

View complete overview of Uttarakhand RES Tender

Rural Engineering Service - RES Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date27 Mar 2023
Closing Date5 Apr 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Residential Building Type 3 04 No At Chief Medical Officer Office Uttarkashiice

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. up to floor five level,excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) 5.2.2

17.44

-

-

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). 5.3

68.88

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete 5.9.1

99.44

-

-

... More
Centring and shuttering including strutting,ropping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. 5.9.3

441.5

-

-

... More
Centring and shuttering including strutting,ropping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers 5.9.5

187.74

-

-

... More
Centring and shuttering including strutting,ropping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts 5.9.6

208.08

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more 5.22.6

15903.15

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) 6.1.2

19.31

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.