Public Works Department Tender
View complete overview of Uttarakhand PWD Tender
Public Works Department - PWD Tender
Eprocure
Opening Date20 Feb 2019
Closing Date7 Mar 2019
Tender Amount₹ 2,50,00,000
Costs
EMD
₹ 5,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_pwd_15765_1Bid Award Id
ViewTender No
271/Nivida-Bage/2019 Dtd 13.02.2019Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://pwd.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
1697.22
-
-
... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
149.1
-
-
... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
40.26
-
-
... More
C/O 1 m span scupper with CC baseConstruction of 1 m span scupper of RR 1: 6abutment ,RCC slab as per attached drawing including supply of all material, labour, T&P etc. required for
proper completion of the work.
-
-
-
... More
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
2445.57
-
-
... More
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M10 (Nominal mix 1:3:6 )
168.98
-
-
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
429.5
-
-
... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
659.51
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawings andtechnical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) R.C.C. grade M 25
145.51
-
-
... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructruecomplete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202(The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS1786:2008 clause no. 1.6)
140.82
-
-
... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
422.46
-
-
... More
Construction of Causeway per drawing including supply of all material, labour, T&P etc. required for proper completion of the work.
-
-
-
... More
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
49.32
-
-
... More
Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)
49.32
-
-
... More
Construction of Hill side Kutcha drain as per drawing (Top 0.60m, Bottom 0.30m & Height 0.45 m as per site) in accordance with the requirement as directed by Engineer-in-charge
4000
-
-
... More
WBM Grading 1 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404.By Manual Means
72.9
-
-
... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standarddesign as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
-
-
-
... More
5th Kilometre Stone (precast)
1
-
-
... More
Ordinary Kilometer Stone (Precast)
4
-
-
... More
200 m stone (precast)
20
-
-
... More
Construction of Perapet as per drawing including supply of all material, labour, T&P etc. required for proper completion of the work.
-
-
-
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.Nominal mix 1:3.6 (Hand mixing)
83.48
-
-
... More
Providing Plum concrete 1:3:6 with 40% plum and 60% 1:3:6 cement concrete.
217.5
-
-
... More
Muck Disposal
-
-
-
... More
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
756
-
-
... More
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications
360
-
-
... More
Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD
Uttarakhand specifications)
864
-
-
... More
Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 (Muc.Disposal)
25506.85
-
-