Public Works Department Tender

View complete overview of Uttarakhand PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date13 Nov 2024
Closing Date27 Nov 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M15

4.5

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specificationsRCC Grade M35

31.34

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M35 Height upto 5m

29.42

-

-

... More
Furnishing and Placing Reinforced / Prestressed cement concrete in super-structure as per drawing and Technical Specification PSC Grade M-40

1.02

-

-

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

1.88

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

6.11

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1

-

-

... More
Supply and fabrication of steel truss bridge as per detailed drawing attached including supply of all structural steel confirming IS 226 - 1969 required for proper completion of the bridge including ground errection of the bridge and one coat of approved quality anticirrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing, required equipment shall be arranged by the contractor at his own cost which shall be taken back by the contractor after satisfactory execution of the job, the rates shall include ground errection in the workshop and its dismentling after inspection, approval and removing defects, match marking of all parts, numbering and proper stacking in the premises of workshop before cartage to site of work. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting, labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts.

11.29

-

-

... More
Erection of Steel Truss (Girder) Bridge (up to 60m span) as per drawing with required camber including cartage of fabricated parts from the place of stack near site including submission of launching plan by the contractor, (duly vetted by a recognised reputable institution/ consultant if required) and approved by the engineer-in-charge. Service bolts to used shall be of approved make. The rate including of cost of all labour, T&P, equipments, civil work and consumables, cost of arranging, fabricating, errecting and dismantling of erection scheme including the cost of its designing, revising, supervision by contractor's designeer at site during erection, also including cost of all safety measures and necessary insurances of bridge and labours for proper completion of the work as per MORTH specification no. 1905 with due regard of mansoon and as per directions of the engineer-in-charge.

11.29

-

-

... More
Supplying and fixing of 24 mm dia P.F make 8.8 Grade HSFG High Strength Friction Grip Bolt To IS 800:1367(Part 3):2000 latest to grade 108 and high strength Friction 2 No washer including Supply of all labour,material,Fixing at site all taxes, T&P etc. required for proper completion of the work.

256

-

-

... More
Supplying and fixing of 16 mm dia P.F make 8.8 Grade HSFG High Strength Friction Grip Bolt To IS 800:1367(Part 3):2000 latest to grade 108 and high strength Friction 2 No washer including Supply of all labour,material,Fixing at site all taxes, T&P etc. required for proper completion of the work.

328

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

9.4

-

-

... More
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)

52.24

-

-

... More
Painting Two Coats on New Steel Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)

106.43

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing (Excluding Cost of Bearing) consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

-

-

-

... More
Manufacturing & Supply of 24 Mtr span POT cum PTFE for 20 MT Capacities. Guided (L) Bearing

14

-

-

... More
Manufacturing & Supply of 24 Mtr span POT cum PTFE for 20 MT Capacities. Free POT-PTFE Bearing

14

-

-

... More
Manufacturing & Supply of 24 Mtr span POT cum PTFE for 20 MT Capacities. Fixed POT Bearing

14

-

-

... More
Manufacturing & Supply of 24 Mtr span POT cum PTFE for 20 MT Capacities. Guided (T) Bearing

14

-

-

... More
Drainage Spouts complete as per drawing and Technical specification

8

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

2

-

-

... More
For Bridge Protaction Work

-

-

-

... More
Excavation in foundation for retaining, breast walls etc, in all types of soilsand rocks including all lead, lift and disposal of surplus material as perdirection of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction

75.4

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M15

15.08

-

-

... More
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.

241.9

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.