Public Works Department Tender
View complete overview of Uttarakhand PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Apr 2023
Closing Date24 Apr 2023
Tender AmountRefer Documents
Costs
EMD
₹ 8,80,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_pwd_57237_1Bid Award Id
ViewTender No
909/23M-04/2023 Dt 28-3-23Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) For Grading II 19 mm nominal size (Rates shall be based on bitumen content 3.30% of total mix by weight and density of finished B.M. as 2.20 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 42465.09 per MT and aggregate @ Rs. 1493.48 per cum inclusive of cartage) As per attached analysis
101
-
-
... More
Providing and laying Bituminous Concrete with 60-90 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (bituminous binder @ 5.4 % of mix)
851
-
-
... More
dq.Ms'ojh iPpkokyk xka/khvkJe ekxZ
-
-
-
... More
Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
2700
-
-
... More
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
9450
-
-
... More
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, (Including cost of bitumen)
18746
-
-
... More
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) complete in all respects. Grading II - 19mm nominal size (Rates shall be based on bitumen content 3.30% of total mix by weight and density of finished D.B.M. as 2.20 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 44579.40 per MT and aggregate @ Rs. 1735.80 per cum inclusive of cartage) (Including cost of bitumen)
58.9
-
-
... More
Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects for Grading-II bitumen VG-30 (Rates shall be based on bitumen content 5.00% of total mix by weight and density of finished SDBC as 2.31 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 44579.40 per MT and aggregate @ Rs. 1735.80 per cum inclusive of cartage) (Including cost of bitumen)
448
-
-
... More
xzke edksfu;k ls jk0ek0 734 ij /keZiqj pkSjkgs gksrs gq, tliqj /kkeiqj ¼Hkwriqjh½ ekxZ dks feykus okyk ekxZ
-
-
-
... More
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
7300
-
-
... More
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, (Including cost of bitumen)
16605
-
-
... More
Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) For Grading II 19 mm nominal size (Rates shall be based on bitumen content 3.30% of total mix by weight and density of finished B.M. as 2.20 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 42465.09 per MT and aggregate @ Rs. 1493.48 per cum inclusive of cartage) As per attached analysis
52.1
-
-
... More
Providing and laying Semi Dense Bituminous Concrete with 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects For Grading II 10 mm nominal size, bitumen VG-30 (Rates shall be based on bitumen content 5.00% of total mix by weight and density of finished SDBC as 2.31 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 42465.09 per MT and aggregate @ Rs. 1493.48 per cum inclusive of cartage) (Including cost of bitumen)
389.1
-
-
... More
dk'khiqj fd;k [kjek'kk ekxZ
-
-
-
... More
Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
2400
-
-
... More
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
9600
-
-
... More
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, (Including cost of bitumen)
30174
-
-
... More
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) complete in all respects. Grading II - 19mm nominal size (Rates shall be based on bitumen content 3.30% of total mix by weight and density of finished D.B.M. as 2.20 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 44579.40 per MT and aggregate @ Rs. 1735.80 per cum inclusive of cartage) (Including cost of bitumen)
61.9
-
-
... More
Providing and laying Bituminous Concrete with 60-90 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II bitumen VG-30 (Rates shall be based on bitumen content 5.40% of total mix by weight and density of finished BC as 2.36 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 44579.40 per MT and aggregate @ Rs. 1735.80 per cum inclusive of cartage) (Including cost of bitumen)
866.3
-
-
... More
dk'khiqj nf;ky ekxZ
-
-
-
... More
Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
2400
-
-
... More
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
3500
-
-
... More
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.40 kg/sqm, (Including cost of bitumen)
22050
-
-
... More
Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) For Grading II 19 mm nominal size (Rates shall be based on bitumen content 3.30% of total mix by weight and density of finished B.M. as 2.20 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 44579.40 per MT and aggregate @ Rs. 1735.80 per cum inclusive of cartage)
93
-
-
... More
Providing and laying Bituminous Concrete with the use of batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects For Grading II 10 mm nominal size, bitumen VG-30 (Rates shall be based on bitumen content 5.40% of total mix by weight and density of finished SDBC as 2.36 ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumen @ Rs. 44579.40 per MT and aggregate @ Rs. 1735.80 per cum inclusive of cartage)
662
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements