State Sec Hill Side Cutting And Scupper Work In Pokhari Harishnkar Chondi Rauta Simlasu M R
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_pwd_37964_1Bid Award Id
ViewTender No
1690/3AC Date23-10-2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://pwd.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109
37.15
-
-
... More
Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
181.14
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
32
-
-
... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 Height upto 5m
19.51
-
-
... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
2.82
-
-
... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc.including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
133.65
-
-
... More
Hand Packed stone filling in back of wallls including cost of all materials, royality,T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
39.33
-
-
... More
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 Nominal mix (1:2:4)
6.85
-
-
... More
Muck Disposal
-
-
-
... More
Loading of Earth, Sand, Moorum, Manure, Flyash by mechanical means including a lead upto 30 m. (Placing tipper at loading point, loading with front end loader excluding time for haulage and return trip.)
7859.68
-
-
... More
Haulage excluding Loading & Unloading- Haulage of materials by tipper excluding cost of loading, unloading and stacking.
7859.68
-
-
... More
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
67.5
-
-
... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter .7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions)..
270
-
-
... More
Construction of reference pillars with RR 1:6 stone masonary and Plastered with 1:4 Mortar, (totally under ground) of length 200mm, width 200mm and height 300mm) as per Fig. 1600.1 (b) and Technical specification Clause 1602.1 of MORD specifications.
77
-
-
... More
Construction of back pillars of RR 1:6 stone masonary and Plastered with 1:4 Mortar, of length 300mm, width 300mm and height 400mm of which 100 mm shall be below ground level as per Fig. 1600.1 (b) and Technical Specification Clause 1602.3 of MORD specifications
77
-
-
... More
Construction of Job pillers of RR 1:6 stone masonary and Plastered with 1:4 Mortar, of length 400mm, width 400mm and height 600mm of which 100 mm shall be below ground level as per Fig. 1600.1 (d) and Technical Specification Clause 1602.4 of MORD specifications
2
-
-