Public Works Department Tender
View complete overview of Uttarakhand PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Excavation
Eprocure
Opening Date26 Feb 2024
Closing Date6 Mar 2024
Tender AmountRefer Documents
Costs
EMD
₹ 4,62,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_pwd_70377_1Bid Award Id
ViewTender No
722/962C-03(Yata C)/2024 Dated 13-02-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://pwd.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
144.84
-
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
35.8
-
-
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Mild steel and Medium Tensile steel bars.Thermo-Mechanically Treated bars of grade Fe-500D or more.
25000
-
-
... More
Centering shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases of columns, etc. for mass concrete
36.45
-
-
... More
Centering shuttering including strutting, propping etc. and removal of form work for Columns, Pillars, Piers, Abutments, Posts and Struts
283.17
-
-
... More
Centering shuttering including strutting, propping etc. and removal of form work for Suspended floors, roofs, landings, balconies and access platform
58.5
-
-
... More
Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) : With F.P.S.(non modular) bricks
43.47
-
-
... More
Coursed rubble masonry (first sort) with hard stone in foundation andplinth with : Cement mortar 1:6 (1 cement : 6 coarse sand)
764.1
-
-
... More
Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level. Masonry work (first sort), in cement mortar 1:6 (1 cement : 6 coarse sand)
279.75
-
-
... More
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.80 mm thick with zinc coating not less than 275 gm/m²
258
-
-
... More
Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
16030
-
-
... More
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture
1216
-
-
... More
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone
912
-
-