Public Works Department Tender
View complete overview of Uttarakhand PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date8 Nov 2024
Closing Date14 Nov 2024
Tender Amount₹ 24,39,000
Costs
EMD
₹ 2,44,000Document Cost
₹ 854Tender Fee
Refer Documents
Summary
Special Repair Of Mewajat Kumukhia Road To Jairampur Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_971812_15Tender No
1838(i)/E-Tender Notice/2024-25 Date 11.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cement concrete with 4 cm gauge approved stone aggregate, coarse sand and cement in proportion 8:4:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work.
29
6400
185600
R.C.C. work with cement, approved coarse sand and 20mm gauge approved stone grit in proportion of 1:1.5:3 in slabs/C.C. road excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. required for proper completion of work, binding wire to be supplied by the contractor free of cost.
72
7900
568800
M.S. torsteel in plain work such as R.C.C. or R.B. work including binding for proper shape and including supply of steel and its wastage, bend hooks and autorised overlapping shall be measured.
36
5900
212400
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
110
100
11000
Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance.
Payment of Maintenance work as Percentage of final Civil Construction Cost.
0.3
-
-
For Ist Year @ 0.00 %
0.3
-
-
For IInd Year @ 0.25 %
0.3
-
-
For IIIrd Year @ 0.50 %
0.3
-
-
For IVth Year @ 0.75 %
0.3
-
-
For Vth Year @ 1.00 %
0.3
-
-