Public Works Department Tender
View complete overview of Uttarakhand PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date18 May 2022
Closing Date16 Jun 2022
Tender AmountRefer Documents
Costs
EMD
₹ 5,10,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_pwd_44639_1Bid Award Id
ViewTender No
1835/Nivida-01/2022-23 dated 11/05/2022Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://pwd.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
2784.53
-
-
Random Rubble Masonary laid dry in breast wall,retaining wall, scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)
2894.59
-
-
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete.
163.97
-
-
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
1175.97
-
-
C/O 1 m span scupper with CC base . Construction of 1 m span scupper of RR 1: 6 abutment ,RCC slab as per attached drawing including supply of all material, labour, T&P etc. required for proper completion of the work.
-
-
-
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer- in - charge
3207.6
-
-
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
991.44
-
-
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C. grade M 25
132.84
-
-
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no.
130.35
-
-
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4)
12.96
-
-
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6
233.28
-
-
Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)
369.36
-
-
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete.
466.56
-
-
Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be
used in embankment with a lift upto 3m and lead of 50 m (average lea
4855
-
-
5th Kilometer stone (Precast)
2
-
-
Ordinory kilometer stone (Precast)
4
-
-
200 m stone (precast)
20
-
-
Construction of Plum Concrete Parapet with 60% cement concrete M-15 (1:3:6 Mix) & 40 % plum (approved stone of maximum size 200 mm) as per standard drawing & as per direction of Engineer-in - Charge
250
-
-
WBM Grading 1Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper g
89.1
-
-
MUCK Disposal Plan
-
-
-
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal osurplus material as per direction of engineer - in -charge
189
-
-
Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD
Uttarakhand specifications) GI wire 10 gauge BWG
567
-
-
Removal of Unsuitable Soil with Disposal,Removal of unsuitable soil including excavation, loading and disposal upto 1000m,lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
6461.2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements