Public Works Department Tender

View complete overview of Uttarakhand PWD Tender

Public Works Department - PWD Tender

Works
Eprocure
Opening Date28 Jun 2019
Closing Date12 Jul 2019
Tender Amount₹ 2,75,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Random Rubble Masonary laid dry in breast wall,retaining wall, scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)

2894.59

-

-

... More
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete.

163.97

-

-

... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)

1175.97

-

-

... More
C/O 1 m span scupper with CC base . Construction of 1 m span scupper of RR 1: 6 abutment ,RCC slab as per attached drawing including supply of all material, labour, T&P etc. required for proper completion of the work.

-

-

-

... More
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer- in - charge

3207.6

-

-

... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)

826.2

-

-

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

132.84

-

-

... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD pecifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)

130.35

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4)

12.96

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20

233.28

-

-

... More
Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)

369.36

-

-

... More
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete.

466.56

-

-

... More
Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.

1730

-

-

... More
5th Kilometer stone (Precast)

1

-

-

... More
Ordinory kilometer stone (Precast)

4

-

-

... More
200 m stone (precast)

20

-

-

... More
Construction of Plum Concrete Parapet with 60% cement concrete M-15 (1:3:6 Mix) & 40 % plum (approved stone of maximum size 200 mm) as per standard drawing & as per direction of Engineer-in - Charge

142

-

-

... More
WBM Grading 1Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405. By Manual Means

7.12

-

-

... More
Muck Disposal Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal osurplus material as per direction of engineer - in -charge

535.5

-

-

... More
Muck Disposal Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)GI wire 10 gauge BWG

1521

-

-

... More
Muck Disposal Removal of Unsuitable Soil with Disposal,Removal of unsuitable soil including excavation, loading and disposal upto 1000m,lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11

6491.16

-

-

... More
Maintenance of Work for 1st Year

5

-

-

... More
Maintenance of Work for 2nd Year

5

-

-

... More
Maintenance of Work for 3rd Year

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.