Public Works Department Tender

View complete overview of Uttarakhand PWD Tender

Public Works Department - PWD Tender

Works
Eprocure
Opening Date19 Oct 2021
Closing Date25 Oct 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4)

0.9

-

-

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

24

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20

10.95

-

-

... More
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202. (The reinforcement steel shall be as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)

10.38

-

-

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

376.2

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 For Grading II Material

680.4

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density. as per Technical Specification .[Grading of no-2] (45-63 mm size)

315

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density. as per Technical Specification .[Grading of no-3] (22.4-53 mm size).

315

-

-

... More
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, (excluding cost of bitumen)

4200

-

-

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thicknesscomposed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. engineer-in-charge. Bitumen (VG-30) (excluding cost of bitumen)

4200

-

-

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 by manual means case II type B Bitumen(VG-30) (excluding cost of bitumen)

4200

-

-

... More
(Edging with 2nd class bricks, laid dry lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres)

2240

-

-

... More
Maintenance of Road after completion of work Maintenance for First Year such as treeming of grass and weeds from the shoulders,/berms (twice in a year), cleaning of culverts/scupper/hume pipe, filling of ruts/khuds in shoulders/berms, maintenance of road signs etc as per direction of Er in Charge.

1

-

-

... More
Maintenance for Second Year such as treeming of grass and weeds from the shoulders,/berms (twice in a year), cleaning of culverts/scupper/hume pipe, fillinf of ruts/khuds in shoulders/berms, maintenance of road signs etc as per direction of Er in Charge.

1

-

-

... More
Maintenance for Third Year such as treeming of grass and weeds from the shoulders,/berms (twice in a year), cleaning of culverts/scupper/hume pipe, fillinf of ruts/khuds in shoulders/berms, maintenance of road signs, repair of pot holes/ patch repair etc as per direction of Er in Charge.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.