Pradhan Mantri Gram Sadak Yojana Tender
View complete overview of Uttarakhand PMGSY Tender
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 84,89,000
Costs
EMD
₹ 1,70,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CCUK_132730_14Bid Award Id
ViewTender No
NIT_2443_02032024Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Random Rubble Stone Masonry Laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications
101.25
-
-
... More
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications
317.25
-
-
... More
Providing concrete for P.C.C grade M 10 Nominal mix 1:3:6 in open foundations complete as per drawings and technical specifications
7.43
-
-
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification
483.45
-
-
... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification
49.5
-
-
... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification
66
-
-
... More
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
211.2
-
-
... More
Repair of Drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification
2580
-
-
... More
Repair of Earthen Shoulder Filling with fresh selected soil Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification
1195.2
-
-
... More
Repair of WBM Road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical specification
963
-
-
... More
WBM Grading 3 By Mechanical Means
Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, handpacking, rolling with three wheel 80-100 kN static roller in stages to proper gradeand camber, applying and brooming, crushable screening to fill-up the interstices ofcoarse aggregate, watering and compacting to the required density Grading 3 as perTechnical Specification
34.49
-
-
... More
Prime Coat Low Porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification
12000.08
-
-
... More
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification
12000.08
-
-
... More
20 mm Thick Open Graded Premix Carpet of Cold Mixed Using Bitumen Emulsion Providing, laying and rolling open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm nominal ize aggregates using cationic bitumen emulsion ( medium setting MS grade complyingwith IS:8887) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per MORD Specification
12000.08
-
-
... More
Seal Coat Type B Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification
12000.08
-
-
... More
Emergency Maintenance
-
-
-
... More
Major Slip Clearance in all Type of Soil, rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification
-
-
-
... More
Ist Year
124
-
-
... More
2nd Year
103.32
-
-
... More
3rd Year
82.68
-
-
... More
4th Year
62
-
-
... More
5th Year
41.32
-
-
... More
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of work
-
-
-
... More
Ist Year
16.52
-
-
... More
2nd Year
12.4
-
-
... More
3rd Year
10.32
-
-
... More
4th Year
8.28
-
-
... More
5th Year
6.2
-
-
... More
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301
-
-
-
... More
Ist Year
27.9
-
-
... More
2nd Year
27.9
-
-
... More
3rd Year
13.95
-
-
... More
4th Year
13.95
-
-
... More
5th Year
13.95
-
-
... More
Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)
-
-
-
... More
Ist Year
37.2
-
-
... More
2nd Year
28.92
-
-
... More
3rd Year
20.68
-
-
... More
4th Year
16.52
-
-
... More
5th Year
12.4
-
-
... More
Under PBMC
-
-
-
... More
1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907.
3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 .
4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908.
5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910.
7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.
8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year).
9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.
-
-
-
... More
Ist Year
3.1
-
-
... More
2nd Year
3.1
-
-
... More
3rd Year
3.1
-
-
... More
4th Year
3.1
-
-
... More
5th Year
3.1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements