Pradhan Mantri Gram Sadak Yojana Tender
View complete overview of Uttarakhand PMGSY Tender
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Eprocure
Opening Date28 Nov 2018
Closing Date31 Dec 2018
Tender Amount₹ 7,84,10,000 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 14,08,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_CCUK_71182_1Bid Award Id
ViewTender No
BRIDCUL-URRDA_1959_20112018Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Embankment with Material Obtained from Roadway Cutting with approved materials deposited at site from roadway as directed by Engineer-in-charge and MORD Specification 301.5.5 for Shoulder Filling .
4776.94
-
-
Construction of Kutcha Hill Side Drain in accordance with the requirement as directed by Engineer-in-charge and MoRD Specification Clause 1606.1
11251.2
-
-
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408
7561.26
-
-
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.By manual means
3968.36
-
-
WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarseaggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405,By manual Means
3521.93
-
-
Low porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502.
49497.75
-
-
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per Technical Specification Clause 503.
49497.75
-
-
Providing laying and rolling of cold mixed open graded Permix carpet of 20 mm thickness composed of 13.2mm 5.6mm aggregetes using penitration grade catonic bitumen emulsion (tarlor mece binder) to required line, grade and level sareve as wearing caousre on a previously prepared base including mixing in a suitable plant laying and rolling with a three weel 18-100 kn static roller capicity finished to requrired level and grades to be followed by seal coat of either type B as per MORD Specification clause 505.2 (Emulsion used for cold mix shall be supplied from authorized supplier of IPR's owner i.e. CRRI New Dehli)
49497.75
-
-
Providing and laying seal coat by Bituminous (Tailor made Binder) as binder for sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type B as per Technical specificatio Clause 508 (Emulsion used for cold mix shall be supplied from authorized supplier of IPR's owner i.e. CRRI New Dehli)
49497.75
-
-
Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MoRD specification clause 305 (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit, drain etc.)
3625.2
-
-
Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit, darin etc.)
1815.52
-
-
Providing and laying of concrete for plain concrete for structures P.C.C grade M 20.
128.67
-
-
15 mm thick Plastering with cement mortar 1:4 including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clauses No.613.4. (Culvert,Parapet, Bridge, drain etc.)
3002.18
-
-
Providing and laying of concrete for plain/reinforced concrete in open foundations for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 , 1202 & 1203 for P.C.C grade M 10. Nominal mix 1:3:6 . (Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit etc.)
293.41
-
-
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC/PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards face complete as directed by Engineer -in-charge and MORD specification Clauses1206.6.
409
-
-
HP stone filling in back of structures including supply of all material, labour, T&P etc. required for proper completion as directed by Engineer-in-charge and MORD specification clause 1604.7. (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit etc.)
759.87
-
-
Providing and laying of concrete for plain/reinforced concrete for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 for R.C.C grade M 25. (scupper, Culvert, Causeway, Bridge etc.) Sub-Structure
89.64
-
-
Supplying, cutting , and placing of HYSD bar reinforcement in substructure/superstructure complete (IS1786:2008 clause no. 1.6) Steel shall not be from rerolling plants and shall conform to relevent IS Code including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge as per MORD specification no. 1000 (Culvert, Bridge, Causeway, Scupper etc.)
55.23
-
-
Providing and laying of concrete for plain/reinforced concrete for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 for R.C.C grade M 25. (scupper, Culvert, Causeway, Bridge etc.) Super Structure
4.55
-
-
Construction of R. R. stone masonary laid dry including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Dry Scupper, Catchpit etc.)
1856.64
-
-
Pointing with cement mortar 1:3 including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clauses No.613.3 (Culvert, Causeway, Bridge, parapet etc.)
733.7
-
-
White washing two coats on parapet walls and tree turnks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916 of MoRD specifications for Rural Roads 2014.
1875.72
-
-
Providing edge stones on valley side of formation as directed by Engineer-in-charge and MoRD Specification Clause 1608.4
6030
-
-
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing notless than 25 kg each as directed by Engineer-in-charge and MoRD specification 1301 .
163.13
-
-
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90
1172.42
-
-
Rewriting and repainting on Title Information Board with PMGSY Logo at suitable place in the starting of the road Fixed In Stage I as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
1
-
-
Rewriting and repainting on PMGSY Logo Board at starting point, end point and at every 2 Km distance of road length fixed in Stage Ias per standard drawing duly painted and written and as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
6
-
-
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .
1
-
-
Rewriting and repainting on Citizen Information Board with PMGSY Logo at starting or prominent location fixed in Stage I (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
1
-
-
Providing & fixing of Semi reflective Traffic Sign Boards (cautionary, mandatory & informatory) as per attached drawing duly painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .
52
-
-
Direction and place indentification sign board up to 0.9 sqm size board. Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and as directed by Engineer in charge/ as per Clause 1701of MORD Specification for Rural Roads 2014. .
11.7
-
-
Prepairing the Plane Table survey & Levelling for completion Plan as per Engineer-in-Charge & as per P.W.D. specification.
13.4
-
-
Maintenance Activities:
-
-
-
Emergency Maintenance Activities (O/C)
-
-
-
Deploying hydraulic excavation of 0.90 cum bucket for clearence of major slip in all type of soil,rock and boulder including its oprator,fuel all other charge and taxes required for proper complition of the work.
-
-
-
1st year
20.8
-
-
2nd year
23
-
-
3rd year
19.7
-
-
4th year
16.4
-
-
5th year
15.6
-
-
Maintenance Activities-Slip clearance of earth and boulders and other small loose materials after hill side cutting in rainy season including disposal of material as directed by Engineer-in-charge and as per MoRD specifications, Clause 1611 .
-
-
-
1st year
492.1
-
-
2nd year
400
-
-
3rd year
430.25
-
-
4th year
356.1
-
-
5th year
375
-
-
Coolie walling including s/o all material,labour,t&p,royalty etc.required for proper complition of the work as directed by E/I. as per PWD specification 8.90 (for open communication only)
-
-
-
1st year
31.2
-
-
2nd year
25.18
-
-
3rd year
25.56
-
-
4th year
20.35
-
-
5th year
15.4
-
-
Providing and laying of boulder apron laid in wire crates with 4 mm dia wire confirming to IS 280 & IS 4826 in 100 mmx100 mm mesh (woven diagonaly) including 10%extra for laps and joints laid with stone boulders weighing not less then 25 kg each as per drawing and technical specification clause 1301
-
-
-
1st year
20.8
-
-
2nd year
15.12
-
-
3rd year
16.71
-
-
4th year
10.56
-
-
5th year
10.55
-
-
PBMC
-
-
-
Routine Maintenance- UnderPBMC:- Maintenance under PBMC for 1] Drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907. 2] Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908.
3] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 4] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place dentifications sign board as perdrawings and technical specification Clause 1910.
5] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.
6] Making up loss of material / irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903.
7] Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat with bitumen emulsion, 20 mm thick pre-mix carpet using catonic bitumen emulsion and seal coat type B with bitumen emulsion. [in 3rd & 5th Year]
8] White washing of parapet walls of CD work and tree truncks hite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.
9] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914.
-
-
-
Year 1
13.4
-
-
Year 2
13.4
-
-
Year 3
13.4
-
-
Year 4
13.4
-
-
Year 5
13.4
-
-