Pradhan Mantri Gram Sadak Yojana Tender
View complete overview of Uttarakhand PMGSY Tender
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Eprocure
Opening Date30 Jan 2019
Closing Date14 Feb 2019
Tender Amount₹ 5,55,99,329 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 13,15,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Masi-jalali Mr To Kabdola Kabrola Via Kanrai Stage-ii
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CCUK_73174_4Bid Award Id
ViewTender No
URRDA_NPCC_30012019Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
rumble stone masonary in Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90
2674
-
-
... More
PROTECTION WORK
-
-
-
... More
excavation in foundation for strucures in all types of soil and rocks including all lead ,lift and disposal of surplus material as directed by engineer in charge & MORD specifications for Rural Roads 2014.
885
-
-
... More
construction of R.R stone masonary in cement mortar 1:5 iuncluding supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
292
-
-
... More
Construction of R.R. stone masonary laid dry supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014. Clause 1604, 700
1450
-
-
... More
providing and lying filter media as hand packed stone filling in the back of retaining walls,abutment,wing walls etc.by locally available approved stone including suplly of all materials,labour,t & p etc.required for proper completion of work as directed by Engineer-in-charge.
249
-
-
... More
construction of parapet in R.R stone masonary laid 1:5 cement sand mortar without PCC in foundation including top cement concrete 2.5 cm thick in M20 and 15 mm thick cement flush pointing in 1:3 cement sand mortar in front side and plaster in 1:4 cement sand mortar in back and both side.
-
-
-
... More
excavation in foundation for strucures in all types of soil and rocks including all lead ,lift and disposal of surplus material as directed by engineer in charge & MORD specifications for Rural Roads 2014.
81
-
-
... More
providing and lying of concrete for plain concrete in open foundations for structures including supply of all materials,labour,t & p etc.required for proper completion of work as directed by Engineer-in-charge.PCC M10 .
81
-
-
... More
construction of R.R stone masonary in cement mortar 1:5 inncluding supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
254
-
-
... More
Pointing with 1:3 cement mortar including supply of all materials, labour,T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
564
-
-
... More
Plastering with cement mortar (1:4) 15 mm thick on stone masonary in substructure as per technical specifiction Clauses 613.4 &1204 including supply of all material, labour, T&P etc required for proper completion of the work
817
-
-
... More
providing and lying of concrete for plain concrete for substructure including supply of all materials,labour,t & p etc.required for proper completion of work as directed by Engineer-in-charge.PCC M20
11
-
-
... More
white washing two coat on parapet walls and tree trunks including prepration of surface by cleaning scraping etc as per technical specification clause of MORD specification for rural road 2014.
1882
-
-
... More
providing and fixing C.C edge stones 12 cm *12cm*60 cmsize precast in M15 cvement concrete with 4 nos 8mm dia HYSD vertical bars and 3nos 6mm dia MS bar stirupes as per approved drawing including 2 coat white washing on velly side of formation as directed by as directed by Engineer-in-charge.
425
-
-
... More
SIDE DRAIN
-
-
-
... More
Construction of hill side Pucca drains as per drawing including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
-
-
-
... More
exavation in foundation for structure in all types of soil and rockes including all lead,lift and disposal of surplus material as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
561
-
-
... More
P.C.C grade M15 Nominal mix 1:2.5:5 (mechanical mix)
88
-
-
... More
Construction of R.R. stone masonary laid dry including bond stones, supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014. Clause 1604, 700
817
-
-
... More
Plastering with cement mortar (1:4) 15 mm thick on stone masonary in substructure as per technical specifiction Clauses 613.4 &1204 including supply of all material, labour, T&P etc required for proper completion of the work
962
-
-
... More
Construction of Hill side Kutcha Trapezoidal drain as per drawing (Top 0.60m, Bottom 0.30m & Height 0.40 to 0.60m as per site) construction of unlined surface drain of average cross sectional area 0.40 sqm in soil & ordinary rock construction of unlined surface to specific lines,grades,levels and dimentions.excavated material to be used in embankment with a lift upto 3m and lead of 50m (avg. lead 25m) as per MORD specification for Rural Roads 2014 Clause 1606.1
10615
-
-
... More
110nmm P.V.C pipe weep hole
1603
-
-
... More
Cross Drainage Work
-
-
-
... More
Excavation in foundation for structures in all types of soils and rocks including all lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
881
-
-
... More
providind and laying of concrete for plain concrete in open foundation foe structure including supply of all material,labour ,TNP ,royalty etc. required for proper copletion of work as as directed by Engineer-in-charge MORD Specification for Rural Roads 2014. PCC grade M10.
81
-
-
... More
construction of R.R. stone masonary in cement mortar 1:5 including supply of all materials ,labor ,TNP ,royalty etc .required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
320
-
-
... More
construction of R.R. stone masonary laid dry supply of all materials,labour ,TNP ,royalty etc. required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
145
-
-
... More
providing and lying filter media as hand packed stone filling in the back of retaining walls,abutment,wing walls etc.by locally available approved stone including suplly of all materials,labour,t & p etc.required for proper completion of work as directed by Engineer-in-charge.
127
-
-
... More
providing and laying of concrete for reinforced concrete for substructers including supply of all materials,labour,T &P ,shuttering ,centering,royalty etc.required for proper completion of work as directed by engineer in charge and MORD specification for rural roads 2014 RCC grade M25 for cross drainage structures such as culverts,bridges etc.
-
-
-
... More
sub structuers
70
-
-
... More
Supplying, fitting , and placing of HYSD bar reinforcement(Fe 415) in substructure complete (IS1786:2008 clause no. 1.6) Steel shall not be from rerolling plants and shall conform to relevent IS Code including supply of all materials, labour,T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge as per MORD Specification for Rural Roads 2014 Clause 1202, 1010, 1002
-
-
-
... More
sub structuers
60
-
-
... More
40 mm C.C M20 in water way
-
-
-
... More
for scrupper
5
-
-
... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards face complete as directed by Engineer-in-charge as per MORD Specification for Rural Roads 2014.
384
-
-
... More
Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P, Roylty etc. required for proper completion of the work.
135
-
-
... More
PAVEMENT WORK
-
-
-
... More
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical
Specification Clause 408. (Using Gravel mix soil)
7762
-
-
... More
WBM Grading-2…..Manual Means
Providing, laying, spreading and compacting stone aggregates of specific sizes(63mm to 45 mm) to water bound macadam including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screenings (Type B-11.2 mm) and binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 of MORD Specification for Rural Roads 2014.
3375
-
-
... More
WBM Grading-3…..Manual Means
Providing, laying, spreading and compacting stone aggregates of specific sizes(53mm to 22.4 mm) to water bound macadam including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screenings (Type B-11.2 mm) to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 of MORD Specification for Rural Roads 2014
3375
-
-
... More
PRIME COAT Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.00 kg/sqm using mechanical means as per Technical Specification Clause 502 of MORD Specification for Rural Roads 2014
44995
-
-
... More
TACK COAT Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces trated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 of MORD Specification for Rural Roads 2014
44995
-
-
... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, (SUCH AS FIXED OR MOBILE MIXED PLANT OF 30-40 TPH AND LAYING PAVER)laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per Technical Specification Clause 508. using Bitumen VG-10
44995
-
-
... More
SEAL COAT Providing and laying seal coat by Bitumen as binder for sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using as per Technical Specification Clause 508 of MORD Specification for Rural Roads 2014
44995
-
-
... More
ROAD FURNITURE
-
-
-
... More
Reinforced cement concrete M15 grade kilometer stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing , directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast)
14
-
-
... More
Reinforced cement concrete M15 grade 5TH kilometer stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing , directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast)
2
-
-
... More
Reinforced cement concrete M15 grade 200 Meter stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing , directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast)
56
-
-
... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
1
-
-
... More
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
2
-
-
... More
Providing & fixing of Mantinance Informatry Sign Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
1
-
-
... More
Maintenance Activities:
-
-
-
... More
Emergency Maintenance
-
-
-
... More
Major Slip Clearnace in all Type of soil, rock and boulders including cost of all material, material machine T&P etc required for proper completion of work as per MORD specification of work 1611
-
-
-
... More
Ist year
849
-
-
... More
2nd year
764.1
-
-
... More
3rd year
687.69
-
-
... More
4th year
618.92
-
-
... More
5th year
557.08
-
-
... More
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator,pol and all other charges required for proper compeletion of work
-
-
-
... More
Ist year
28.3
-
-
... More
2nd year
25.47
-
-
... More
3rd year
22.92
-
-
... More
4th year
20.65
-
-
... More
5th year
18.53
-
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25kg each as per drawing and technical specification 1301
-
-
-
... More
Ist year
28.3
-
-
... More
2nd year
25.47
-
-
... More
3rd year
22.92
-
-
... More
4th year
20.65
-
-
... More
5th year
18.53
-
-
... More
Coolie Walling including supply of all material, labour, T&P,royalty etc. Required for proper completion of the work,as directed by Engineer-in-charge and as per PWD 8.90 specifications (for opening communication only)
-
-
-
... More
Ist year
42.45
-
-
... More
2nd year
38.2
-
-
... More
3rd year
34.38
-
-
... More
4th year
30.98
-
-
... More
5th year
27.87
-
-
... More
PBMC Activities
-
-
-
... More
Maintenance under PBMC for (1) Trimming of grass and weeds from shoulders/berms and disposing off the same to suitable location as per technical specification clause 1914
(2) Maintenance of road side drains including minor slip clearence , reshaping deepening and regarding as well as catch water drains as per technical specification clause 1907
(3) Maintenance of shoulders to the required level by filling/ cutting the soil and its compacting includind disposal of surplus material in approved muck disposal points as per specification clause 1903
(4) Maintenance of scuppers and culverts by way of clearing , erosion repaire , repairs of cracks,parapet walls and protection works as per drawing and technical specification clause 1908 (5) Maintenance of causeway by way of minor surface repairs , replacing guide posts, repair of flood gauges, removal of debris , providing boulders and protection works and painting as per technical specification clause 1909.
(6) Maintenance of road signs by way of cleaning and repainting of mandatory /requlatory / cautionary / informatory and place identifications sign board as per drawing and technical specification clause 1910
(7) Maintenance of 200 metre stones, km stones, 5th Km stone and edge stone by way of refiting of tilted stones repairing with cement mortar , cleaning , repairing and lettering on 200 meter km stone and 5th km stone as per drawing and technical specification clause 1912
(8) repairing of pot holes by removal of loose material, trimiming of side, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year)
(9) Two coat white washing on parapet walls of CD work,edge stones,tree truncks, and prominent rock patches on hill side including preparation of surface by cleaning scraping etc. as per technical specification clause191
-
-
-
... More
Ist year
14.15
-
-
... More
IInd year
14.15
-
-
... More
IIIrd year
14.15
-
-
... More
IVth year
14.15
-
-
... More
Vth year
14.15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements