Pradhan Mantri Gram Sadak Yojana Tender
View complete overview of Uttarakhand PMGSY Tender
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Healthcare and Medicine
Eprocure
Opening Date21 Jan 2019
Closing Date15 Feb 2019
Tender Amount₹ 6,03,00,000
Costs
EMD
₹ 12,07,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CCUK_72465_1Bid Award Id
ViewTender No
URRDA_OMMAS_5688_05012019Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls & retaining walls etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction.
1065.77
-
-
... More
Construction of R. R. stone masonary in cement mortar (1:5) including supply of all materials, labour, T&P, royalty etc, for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. (For cross drainage structure & hill side pucca drain)
456.5
-
-
... More
Providing weepholes in stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe per drawing and technical specification Clauses 614, 709, 1204.3.7
128
-
-
... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
324.82
-
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in100 mm x100mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301.
2306.65
-
-
... More
Excavation for Structures- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing ofsides and bottom and backfilling in trenches with excavated suitable material.
(For Parapet, scupper, catchpit, causeway & hill side pucca drain)
966.4
-
-
... More
Cement plum Concrete with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction.
(For parapet & protection work)
1103
-
-
... More
White washing two coats on parapet walls including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915.
1001
-
-
... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302. (For causeway)
265.8
-
-
... More
Cement plaster 15 mm thick 1:4 on stone masonry including supply of all materials, labour, T & P & royalty etc, required for proper completion of work as directed by Engineer-in-charge and and MORD Specification. (For hill side pucca drain)
1237.5
-
-
... More
Providing concrete for plain/ reinforced concrete in open foundations complete as perb drawings and technical specifications Clause 802, 803, 1202 & 1203. (P.C.C grade M-10) (Nominal mix 1:3:6) (For Cement Concrete Pavement, causeway & catchpit)
228.94
-
-
... More
Bedding for Pipe - Type A (Concrete Cradle) Bedding Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause 1105(i)
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. Nominal mix - P.C.C grade M 15
9.32
-
-
... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (For 1000 mm. Dia NP3 Pipe )
43.8
-
-
... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 By Excavated Granular Material by locally available including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer in charge. (For NP3 Pipe Scupper)
55.12
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructruer complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS1786:2008 clause no. 1.6)
(For Cement Concrete Pavement & causeway)
84.56
-
-
... More
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (R.C.C. grade M 25) (For Cement Concrete Pavement & causeway)
132.9
-
-
... More
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications)
1607.18
-
-
... More
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (For super elevation)
5576.03
-
-
... More
Construction of Kutcha Hill Side trapezoidal Drain in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.
6684.4
-
-
... More
Prepreation & Improved of Sub Grade - Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
37218.48
-
-
... More
Construction of granular sub-base - Granular sub-base/ base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (Using naturally occuring gravel) (Thickness of G.S.B. Leyer - 125mm.)
4652.31
-
-
... More
(Water Bound Macadam with Crushable Screenings) - W.B.M. Grading 2 - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
(By Manual Means) - (Thickness of W.B.M Grading-2 Leyer - 75mm.)
2602.48
-
-
... More
(Water Bound Macadam with Crushable Screenings) - W.B.M. Grading 3- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (By Manual Means) - (Thickness of W.B.M Grading-3 Leyer - 75 mm.)
2602.48
-
-
... More
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (For Patri Filling)
4360.41
-
-
... More
Prime Coat (Low porosity)
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surfece of graneular base incaluding cleaning of road surface and spraying primer & of 0.70-1.00 kg /sqm using machanical menas as per technical sepecification claus 502
34699.73
-
-
... More
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
34699.73
-
-
... More
Providing, laying and rolling of cold mixed open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade Cationic Bitumen Emulsion (Tailor made binder) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MORD Specification Clause 506.2 (Emulsion used for cold mixed shall be Supplied from athorized Supplier of IPR's owner.i.e. CRRI, New Delhi)
34699.73
-
-
... More
Providing and laying seal coat by Bitumen /Bituminious Emulsion (Tailor made binder) as binder for sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using as per Technical Specification Clause 510 of MORD Specification. (Type-B, Bitumen (VG-10 by Manual Means)
34699.73
-
-
... More
Providing edge stones of Size 450mm X 350mm X 100mm on valley side of formation as per drawing and technical specification clause 1608.2.6 as directed by Engineer-in-charge and MORD Specification.
2550
-
-
... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and written as directed by Engineer in charge. as per MORD specification Clause 1701.
1
-
-
... More
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MORD specification Clause 1701
5
-
-
... More
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .
1
-
-
... More
Maintainance Activities:
-
-
-
... More
Emergency Maintenance
-
-
-
... More
Major Slip Clearance in all type of soil, rock and bolders including cost of all material, machine T&p required for proper compeletion of work as per mord specification of work 1611
-
-
-
... More
1st Year
513
-
-
... More
2nd Year
461.7
-
-
... More
3rd Year
415.53
-
-
... More
4th Year
373.98
-
-
... More
5th Year
336.61
-
-
... More
Deploying Hydraulic Excavators of 0.90 cum Bucket for opening of road with required slip clearance in all type of soil, rock and boulders including its Operator, Fuel, all other charge and taxes required for proper completion of work.
-
-
-
... More
1st Year
17.1
-
-
... More
2nd Year
15.4
-
-
... More
3rd Year
14.25
-
-
... More
4th Year
12.5
-
-
... More
5th Year
11.2
-
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25kg each as per drawing and technical specification 1301
-
-
-
... More
1st Year
16.88
-
-
... More
2nd Year
16.88
-
-
... More
3rd Year
16.88
-
-
... More
4th Year
16.88
-
-
... More
5th Year
11.25
-
-
... More
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90 (For Opening Communication Only)
-
-
-
... More
1st Year
26.65
-
-
... More
2nd Year
23.09
-
-
... More
3rd Year
20.78
-
-
... More
4th Year
18.72
-
-
... More
5th Year
16.84
-
-
... More
Routine Maintenance- Under PBMC
-
-
-
... More
Maintenance under PBMC for (1) Trimming of grass and weeds from shoulders/berms and disposing off the same to suitable location as per technical specification clause 1914
(2) Maintenance of road side drains including minor slip clearence , reshaping deepening and regarding as well as catch water drains as per technical specification clause 1907
(3) Maintenance of shoulders to the required level by filling/ cutting the soil and its compacting includind disposal of surplus material in approved muck disposal points as per specification clause 1903
(4) Maintenance of scuppers and culverts by way of clearing , erosion repaire , repairs of cracks,parapet walls and protection works as per drawing and technical specification clause 1908 (5) Maintenance of causeway by way of minor surface repairs , replacing guide posts, repair of flood gauges, removal of debris , providing boulders and protection works and painting as per technical specification clause 1909.
(6) Maintenance of road signs by way of cleaning and repainting of mandatory /requlatory / cautionary / informatory and place identifications sign board as per drawing and technical specification clause 1910
(7) Maintenance of 200 metre stones, km stones, 5th Km stone and edge stone by way of refiting of tilted stones repairing with cement mortar , cleaning , repairing and lettering on 200 meter km stone and 5th km stone as per drawing and technical specification clause 1912
(8) repairing of pot holes by removal of loose material, trimiming of side, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year)
(9) Two coat white washing on parapet walls of CD work,edge stones,tree truncks, and prominent rock patches on hill side including preparation of surface by cleaning scraping etc. as per technical specification clause191
-
-
-
... More
1st Year
8.55
-
-
... More
2nd Year
8.55
-
-
... More
3rd Year
8.55
-
-
... More
4th Year
8.55
-
-
... More
5th Year
8.55
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements