Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Uttarakhand PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date9 Feb 2019
Closing Date6 Mar 2019
Tender Amount₹ 309 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MoRD specification clause 305 (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit, drain etc.)

1244.8

-

-

... More
Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit, drain etc.

1152.04

-

-

... More
Construction of R. R. stone masonary laid dry including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Dry Scupper, Catchpit etc.)

862.25

-

-

... More
HP stone filling in back of structures including supply of all material, labour, T&P etc. required for proper completion as directed by Engineer-in-charge and MORD specification clause 1604.7. (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit etc.)

817.4

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing notless than 25 kg each as directed by Engineer-in-charge and MoRD specification 1301 .

418.5

-

-

... More
Providing and laying of concrete for plain/reinforced concrete in open foundations for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 , 1202 & 1203 for P.C.C grade M 10. (Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit etc.)

102

-

-

... More
Providing and laying of concrete for plain/reinforced concrete for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800, 1202 & 1203 for R.C.C grade M 25. (scupper, Culvert, Causeway, Bridge etc.)

21

-

-

... More
Providing and laying of plain concrete for substructures including supply of all materials, labour, t&p, shuttering, centering , royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification Claue-800, 1202 & 1203.R.C.C.grade M 20 for cross drainage structures such as Culverts , Bridges, scupper and causeway etc.

1.5

-

-

... More
Pointing with cement mortar 1:3 including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clauses No.613.3 (Culvert, Causeway, Bridge, parapet etc.)

130.5

-

-

... More
15 mm thick Plastering with cement mortar 1:4 including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clauses No.613.4. (Culvert,Parapet, Bridge, drain etc.)

670.5

-

-

... More
Providing & fixing of PMGSY Logo Board at starting point, end point and at every 2 Km distance of road length as per attached standard drawing duly painted and written and as directed by Engineer in charge. as per MORD specification Clause 1701

2

-

-

... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and written as directed by Engineer in charge. as per MORD specification Clause 1701 .

2

-

-

... More
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .

2

-

-

... More
White washing two coats on parapet walls and tree turnks including preparation of surface by cleaning scraping etc. as per Clause 1916 of MoRD specifications.

288

-

-

... More
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90

1062.5

-

-

... More
Granular sub-base/surface sourse with local materials (Table 400.13) by mix in place method normal construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at once and compating with smooth weeled roller to achieve the disired density complete as per clause 401.1 as per Techinal specification.

2265

-

-

... More
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.

1299.38

-

-

... More
WBM Grading 3:-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading3 as per MORD Specification Clause 405.

1299.38

-

-

... More
Prime Coat Low porosity - Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.00 kg/sqm. Using mechanical means as per Technical Specification Clause 502.

16575

-

-

... More
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Sepcification Clause 503.

16575

-

-

... More
Premix Carpet 20 mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Bitumen (S-90)

16575

-

-

... More
Providing and laying seal coat by bituminous Emulsion as for sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using type-B as per Techanical specification Clause 508.

16575

-

-

... More
Providing and fixing of C.C Edge Stones 12Cm*12Cm*60Cm size precast in M15 cement concrete with 4No. 8mm dia HYSD vertcal bars and 3No.6mmdia MS bar strrups as per approved drawing including two coat white washing on valley side of formation

300

-

-

... More
EMMERGENCY MAINTENANCE

-

-

-

... More
Major Slip Clearance in all Type of Soil ,rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification of work 1611

-

-

-

... More
Ist Year

300

-

-

... More
Iind Year

270

-

-

... More
IIIrd Year

243

-

-

... More
Ivth Year

218

-

-

... More
Vth Year

196.85

-

-

... More
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of work

-

-

-

... More
Ist Year

10

-

-

... More
Iind Year

9

-

-

... More
IIIrd Year

8.1

-

-

... More
Ivth Year

7.3

-

-

... More
Vth Year

6.55

-

-

... More
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301

-

-

-

... More
Ist Year

10

-

-

... More
Iind Year

9

-

-

... More
IIIrd Year

8.1

-

-

... More
Ivth Year

7.29

-

-

... More
Vth Year

6.56

-

-

... More
Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)

-

-

-

... More
Ist Year

15

-

-

... More
Iind Year

13.5

-

-

... More
IIIrd Year

12.15

-

-

... More
Ivth Year

10.94

-

-

... More
Vth Year

9.84

-

-

... More
Routine Maintenance Under PBMC:

-

-

-

... More
Maintenance under PBMC for 1] Drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907. 2] Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 3] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 4] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place dentifications sign board as perdrawings and technical specification Clause 1910. 5] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.

-

-

-

... More
6] Making up loss of material / irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903. 7] Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat with bitumen emulsion, 20 mm thick pre-mix carpet using catonic bitumen emulsion and seal coat type B with bitumen emulsion. [in 3rd & 5th Year] 8] White washing of parapet walls of CD work and tree truncks hite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191. 9] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914.

-

-

-

... More
Ist Year

5

-

-

... More
Iind Year

5

-

-

... More
IIIrd Year

5

-

-

... More
Ivth Year

5

-

-

... More
Vth Year

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.