Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Uttarakhand PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Eprocure
Opening Date26 Jun 2019
Closing Date16 Jul 2019
Tender Amount₹ 5,64,96,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5

6862.89

-

-

... More
Coolie Walling for Edge /filling protection including supply of all material labour T&P. etc.as per drawing required for proper comletion of word as white washing complete as per the derection of Engineer - in - charge.

1563.8

-

-

... More
PROTECTION WORK

-

-

-

... More
Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD specification clause 305 (R/W, B/W, Parapet, Hume Pipe, ,pucca drain, Catchpit etc.)

1045.29

-

-

... More
Construction of R. R. stone masonary laid dry including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Catchpit etc.)

1397.11

-

-

... More
Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Parapet, Hume Pipe, pucca drain,Catchpit etc.)

162.67

-

-

... More
HP stone filling in back of structures including supply of all material, labour, T&P etc. required for proper completion as directed by Engineer-in-charge and MORD specification clause 1604.7. (R/W, Parapet, Culvert, Hume Pipe, Catchpit etc.)

422.25

-

-

... More
Providing Edge stone on valley side of formation as per drawing including supply of all materials ,labour,T&P etc. required for proper completion of the work as per MORD Specificaion and as directed Engineer-in-charg.

3560

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as directed by Engineer-in-charge and MORD Specification clause 1301.

411.75

-

-

... More
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915

1497.6

-

-

... More
PUCCA DRAIN

-

-

-

... More
Excavation

1749

-

-

... More
PCC1:2:4

185.5

-

-

1325

-

-

... More
Plaster 1:4

1325

-

-

... More
HILL SIDE KACHA DRAIN

-

-

-

... More
Construction of Kutcha Hill Side (trapozodial) Drain in accordance with the requirement as directed by Engineer-in- charge and MoRD Specification Clause 1606.1

5150

-

-

... More
PROTECTION WORK FOR PARAPET

-

-

-

... More
Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD specification clause 305 (R/W, B/W, Parapet, Hume Pipe, ,pucca drain, Catchpit etc.)

37.73

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6

37.73

-

-

... More
Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Parapet, Hume Pipe, pucca drain,Catchpit etc.)

201.83

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4)

8.78

-

-

... More
Construction of hill side drain in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1 Cement plaster 15 mm thick 1:4 on stone masonry

1098.83

-

-

... More
CROSS DRAINAGE WORKS

-

-

-

... More
Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD specification clause 305 (R/W, B/W, Parapet, Hume Pipe, ,pucca drain, Catchpit etc.)

1951.8

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 R.C.C grade M 25

74.24

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)

0.76

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6

140.25

-

-

... More
Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)

533.25

-

-

... More
Random Rubble Masonary laid dry in breast wall,retaining wall, arapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)

787.59

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

127.26

-

-

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 25

24.42

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)

9.58

-

-

... More
Sub Base and Base course

-

-

-

... More
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring gravel

3690.28

-

-

... More
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the Grading 2 as per Technical Specification Clause 405.

2037.9

-

-

... More
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

2037.9

-

-

... More
Medium porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

27172

-

-

... More
Providing and applying Tack coat with bitumenous emulsion ( RS-I) using emulsion distributor @ 0.25 to 0.30 Kg per Sqm on the prepared bituminous surface treated with primer & cleaned with hydraulic broom as per MORD Specification.

27172

-

-

... More
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2

27172

-

-

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 By Mechanical Means Case - I : Type A Bitumen (VG-10)

27172

-

-

... More
ROAD FURNITURE

-

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

-

-

... More
Providing and fixing of Citizen information board with PMGSY Logo at at starting and prominent location (where maximum no. of fitizens can view the detail of the road)as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge

1

-

-

... More
Providing & fixing of Maintenance Board with PMGSY Logo at starting or prominent location as per attached standard drawing dully painted and written as per the MORD specification and direction of Engineer-in-charge.

1

-

-

... More
Maintainance Activities: Emergency Maintainance

-

-

-

... More
Slip clearance (by manual means) of earth and boulders including disposal as cu.m directed by the Engineer-in-charge.

-

-

-

... More
1st year

7420

-

-

... More
2nd year

6232.47

-

-

... More
3rd year

5178.54

-

-

... More
4th year

5427.2

-

-

... More
5th year

4069.41

-

-

... More
Maintenance of drains. The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regarding,deepening of side drains as well as catch water drains as per techinical specification clause 1907 (two times in year)

-

-

-

... More
1st year

7.95

-

-

... More
2nd year

7.95

-

-

... More
3rd year

7.95

-

-

... More
4th year

7.95

-

-

... More
5th year

7.95

-

-

... More
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908.

-

-

-

... More
1st year

27

-

-

... More
2nd year

27

-

-

... More
3rd year

27

-

-

... More
4th year

27

-

-

... More
5th year

27

-

-

... More
Maintenance of Roads Signs Maintenance of road signs by way of cleaning and repainting of mandatory/regulatory/cautionary/informatory and place identifications sign board as perdrawing and technical specification Clause 1910.

-

-

-

... More
3rd year

7.95

-

-

... More
5th year

7.95

-

-

... More
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with coment mortar, cleaning, repairing and lattering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.

-

-

-

... More
3rd year

7.95

-

-

... More
5th year

7.95

-

-

... More
Cutting of shrubs from the Road way or with in R.O.W. including disposal of shrubs to suitable location as per technical specification Clause 1914.

-

-

-

... More
1st year

3180

-

-

... More
2nd year

3021

-

-

... More
3rd year

2901.75

-

-

... More
4th year

2703

-

-

... More
5th year

2583.75

-

-

... More
Trimming of grass and weeds from the shoulders/berms and disposing off the same sq.m to suitable locations as per technical specifications Clause 1914.

-

-

-

... More
1st year

15900

-

-

... More
2nd year

15900

-

-

... More
3rd year

15900

-

-

... More
4th year

15900

-

-

... More
5th year

15900

-

-

... More
White washing of parapet walls of CD work and tree truncks. White washing two coats on perapet walls and tree truncks including preparation of surface by cleaning scrapping etc. as per technical specification Clause 1915. (two times in year)

-

-

-

... More
White washing edge stone

-

-

-

... More
1st year

462.08

-

-

... More
2nd year

462.08

-

-

... More
3rd year

462.08

-

-

... More
4th year

462.08

-

-

... More
5th year

462.08

-

-

... More
White washing parapets

-

-

-

... More
1st year

1146.6

-

-

... More
2nd year

1146.6

-

-

... More
3rd year

1146.6

-

-

... More
4th year

1146.6

-

-

... More
5th year

1146.6

-

-

... More
Maintenance of WBM road including filling up of pot holes, ruts and rectifying sq.m corrugated surface, damaged edges and ravelling as per technical specification Clause 1906.

-

-

-

... More
3rd year to 1% of Surface work

271.72

-

-

... More
5th year to 2% of Surface work

543.44

-

-

... More
Repair to pot holes and removable of loose material, triming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B specification Clause 1904.2

-

-

-

... More
3rd year to 2% of P.C. work

543.44

-

-

... More
5th year to 3% of P.C. work

815.16

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.