Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Uttarakhand PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date6 Aug 2018
Closing Date6 Sep 2018
Tender Amount₹ 344 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

UT-01-102 T01 Almora-Panar M.R. Km. 38 to Ghurkuna MR Stage-I

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For Parapet

13.16

-

-

... More
For Culvert

64.8

-

-

... More
For Scupper

3464.69

-

-

... More
For Causway

407.31

-

-

... More
Construction of R. R . stone masonary in cement mortar 1:5 including supply of all terials,labour,t&p&royaltyetc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604.

-

-

-

... More
For retaining wall & B/W

728.87

-

-

... More
For Parapet

80.73

-

-

... More
For Scupper

1102.42

-

-

... More
For Causway

309.97

-

-

... More
Construction of R. R . stone masonary laid dry including supply of all materials, labour, t&p& royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604.

-

-

-

... More
For retaining wall & B/W

3337.76

-

-

... More
For Scupper

483.12

-

-

... More
For Causway

78.12

-

-

... More
HP stone filling in back of structures including supply of all material, labour, T&P etc. required for proper completion as directed by Engineer-in-charge and MORD specification clause 1604.7)

-

-

-

... More
For retaining wall

5687.24

-

-

... More
For Culvert

33

-

-

... More
For Scupper

305.14

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)including 10 per cent extra for laps and joints laid with stone boulders weighing notless than 25 kg each as per drawing and technical specifications Clause 1301.

-

-

-

... More
For Protection Work

61.88

-

-

... More
For Dumping Places

112.5

-

-

... More
Providing edge stones on valley side of formation as directed by Engineer-in-charge and MORD Specification Clause 1608.4

11.68

-

-

... More
Construction of.C.R stone masonary laid in 1:4 cement sand mortar including supply of all materials, labour,t&p&royaltyetc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 704.4.

135.98

-

-

... More
CR Stone masonry in 1:5 cement/sand mortar for abutment of minor bridges, culverts etc. including all material labour T&P etc. required for proper completion of work as directed by Engineer in charge.technical Specification Clause- 702, 704, 1202 and 1204 of MORD.

173.62

-

-

... More
15 mm thick Plastering with 1:6 cement mortar including supply of all materials, labour,T&P, royalty etc.required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.

260.13

-

-

... More
Pointing with cement mortor (1:3) on brick work as per drawing and technical specification Clauses 613.3 and 1204 fornt

187.2

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Nominal mix (1:2:4)

3.51

-

-

... More
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation ofsurface by cleaning scraping etc. as per technical specifications Clause 1915

579.93

-

-

... More
Construction of Hill side Kutcha Trapezoidal drain as per drawing (Top 0.60m, Bottom 0.30m & Height 0.40 to 0.60m as per site) in accordance with the requirement as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014

6402

-

-

... More
Providing and laying of concrete for plain concrete in open foundations for structures including supply of all materials, labour, T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. P.C.C grade M 10.

-

-

-

... More
For Parapet

13.16

-

-

... More
For Culvert

21.6

-

-

... More
For Scupper

228.85

-

-

... More
Providing and laying of concrete for reinforced concrete for substructure/ super structures including supply of all materials,l abour, t&p, shuttering, centering ,royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.R.C.C.grade M 25

-

-

-

... More
Substructure Scupper

117.36

-

-

... More
Superstructure Culvert

10.26

-

-

... More
Supplying,cutting,and placing of HYSD bar reinforcement in superstructure/superstructure complete (IS1786:2008 clause no.1.6) Steel shall not be from rerolling plants and shall conform to relevent IS Code including supply of all materials,labour,T&P,royalty etc.required for proper completion of work as directed by Engineer-in-charge as per MORD Specification for Rural Roads 2014

-

-

-

... More
Substructure Scupper

97.79

-

-

... More
Superstructure Culvert

9.59

-

-

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209

4

-

-

... More
Tubular Steel Railing of Medium Weight Steel Channel (ISMC series) 100 mm x 50mm or Providing , fixing and erecting of 50 mm dia steel pipe railing in 3 rows duly painted as directed by Engineer-in-charge and MORD specification Clauses 1706

6

-

-

... More
Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P, Roylty etc. required for proper completion of the work as per direction of Engineer in Charge.(As per PWD Uttarakhand specifications)

175.5

-

-

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC/PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards face complete as directed by Engineer-in-charge and MORD specification Clauses1206.6.

1056.24

-

-

... More
Plain/reinforced cement concrete (M25) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

11.74

-

-

... More
Reinforced cement concrete M15 grade 5th kilometer stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing,directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast).

1

-

-

... More
Reinforced cement concrete M15 grade kilometer stone of standard design as per IRC:8 fixing in position including painting and printing,etc as per drawing,directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast).

6

-

-

... More
Reinforced cement concrete M15 grade 200 meter stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing,directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast).

27

-

-

... More
Providing & fixing of PMGSY Logo Board at starting point, as per attached standard drawing duly painted and written as per MoRD specification and direction by Engineer in charge.Technical Specification Clause 1701

1

-

-

... More
Providing & fixing of PMGSY Logo Board at end point and every 2 Km distance of road length as per attached standard drawing duly painted and written as per MoRD specification and direction by Engineer in charge.

4

-

-

... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and written as per the MoRD specification and direction given by Engineer in charge.Clause 1701 and Annexure 1700.1

1

-

-

... More
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as per the MoRD specification and direction of Engineer-in-charge.Clause 1701 and Annexure 1700.1(starting and every 5Km)

2

-

-

... More
Providing & fixing of Semi reflective Traffic Sign Boards (cautionary, mandatory & informatory) as per attached drawing duly painted and written as per the MoRD specification and as directed by Engineer-in-charge.

1

-

-

... More
Providing fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (Where maximum no.of citizens can view the detail of the road) as per standard drawing duly painted and written as directed by Engineer in charge/as per IRC/MORD Specification for Rural Road 2014.

1

-

-

... More
Maintainance Activities:

-

-

-

... More
Major Slip Clearance in all Type of Soil ,rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification of work 1611

-

-

-

... More
1st Year

5300

-

-

... More
2nd Year

4240

-

-

... More
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of work

-

-

-

... More
1st Year

160

-

-

... More
2nd Year

140

-

-

... More
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301

-

-

-

... More
1st Year

28.13

-

-

... More
2nd Year

28.13

-

-

... More
Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)

-

-

-

... More
1st Year

36

-

-

... More
2nd Year

25.2

-

-

... More
Routine Maintenance - Under PBMC

-

-

-

... More
Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.

-

-

-

... More
1st Year

6.625

-

-

... More
2nd Year

6.625

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.