Pradhan Mantri Gram Sadak Yojana Tender
View complete overview of Uttarakhand PMGSY Tender
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Eprocure
Opening Date11 Feb 2019
Closing Date2 Mar 2019
Tender Amount₹ 4,01,72,000
Costs
EMD
₹ 8,03,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CCUK_74475_1Bid Award Id
ViewTender No
UT0227Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
PROTECTION WORK :
-
-
-
... More
Excavation for Structures:- Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MoRD as per Technical Specification Clause 305.1&300
2059.37
-
-
... More
Random rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for cross drainage structures, retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge..
753.95
-
-
... More
Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge..
3453.09
-
-
... More
HP stone filling in back of structures including supply of all material, labour, T&P, royalty etc. required for proper completion as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (For R/Wall, B Wall )
1580.86
-
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each (crate size 3.00m * 1.50m* 1.25m) as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
1451.25
-
-
... More
Construction of Road Side Parapat above Scupper Slab
-
-
-
... More
Excavation for Foundation
-
-
-
... More
Cement Concrete 1:3:6
-
-
-
... More
R.R. stone masonary in cement mortar 1:5
40.4
-
-
... More
C.C in M 20 At Top Surface
1.79
-
-
... More
Plaster in 1:4 Back side and Both Sides
135.72
-
-
... More
Flushing pointing in 1:3 in front Side
93.6
-
-
... More
White washing Two Coats
299.52
-
-
... More
Kuttcha / Pucca Drain
-
-
-
... More
Construction of Hill side Kutcha Trapezoidal drain as per drawing (Top 0.60m, Bottom 0.30m & Height 0.40 to 0.60m as per site) in accordance with the requirement as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014
5150
-
-
... More
Cross Drainage Structure
-
-
-
... More
Excavation in foundation for structures in all types of soils and rocks including all lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (X-Drainage/ Drainage Structure, )
3755.37
-
-
... More
Construction of R.R. stone masonary in cement mortar 1:5 including supply of all materials,labour, T&P,Royalty etc required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. ( X-Drainage/ Drainage Structure)
1129.85
-
-
... More
Construction of R.R. stone masonary laid dry including bond stones, supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014. ( X-Drainage/Drainage structure)
454.2
-
-
... More
HP stone filling in back of structures including supply of all material, labour, T&P, royalty etc. required for proper completion as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. X-Drainage/Drainage structure) Scupper
390.52
-
-
... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards face complete as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
957
-
-
... More
Providing and laying of concrete for plain concrete in open foundations for structures including supply of all materials, labour, T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. P.C.C grade M 10. ( For X-Drainage/Drainage straucture)
251.41
-
-
... More
Providing and laying of concrete for reinforced concrete for structures including supply of all materials, labour, t&p, shuttering, centering , royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. PCC .grade M 25 for cross drainage structures such as Culverts , Bridges etc. (For X Drainage/ Drainage Structure)
14.81
-
-
... More
Providing and laying of concrete for reinforced concrete for structures including supply of all materials, labour, t&p, shuttering, centering , royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.R.C.C.grade M 25 for cross drainage structures such as Culverts ,Scupper (Sub Structure)
188.19
-
-
... More
Providing and laying of concrete for reinforced concrete for structures including supply of all materials, labour, t&p, shuttering, centering , royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.R.C.C.grade M 25 for cross drainage structures such as Culverts , Bridges etc. Super Structure
129.17
-
-
... More
Supplying, cutting , and placing of HYSD bar reinforcement in substructure/superstructure complete (IS1786:2008 clause no. 1.6) Steel shall not be from rerolling plants and shall conform to relevent IS Code including supply of all materials, labour,T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge as per MORD Specification for Rural Roads 2014 (Sub Structure)
152.76
-
-
... More
Supplying, cutting , and placing of HYSD bar reinforcement in substructure/superstructure complete (IS1786:2008 clause no. 1.6) Steel shall not be from rerolling plants and shall conform to relevent IS Code including supply of all materials, labour,T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge as per MORD Specification for Rural Roads 2014 (Super Structure)
87.05
-
-
... More
Construction of C.R stone masonary laid in 1:4 cement sand mortar including bond stones, supply of all materials, labour,T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD specifications for Rural Roads 2014. (For Culvert & Bridge )
276.85
-
-
... More
Construction of C.R. stone masonary laid in 1:5 cement sand mortar including bond stones, supply of all materials, labour, T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MoRD specifications for Rural Roads 2014.
170.32
-
-
... More
Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level, Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m centre-to- centre complete as per approved drawingsClause 1706
132
-
-
... More
ROAD FURNITURE
-
-
-
... More
Reinforced cement concrete M15 grade kilometer stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing , directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast).( 5 km stone)
1
-
-
... More
Reinforced cement concrete M15 grade kilometer stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing , directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. (precast).( km stone)
5
-
-
... More
Providing and fixing of Hectometer stone as per standard drawing made of precast R.C.C. M15 grade fixed with P.C.C. M10 grade, including excavation of pit, painting and printing letters on kilometer stone with two coat of synthetic enamel paint of approved quality as directed by Engineer in charge.
24
-
-
... More
Providing & fixing of PMGSY Logo Board at starting point, end point and at every 1 Km distance of road length as per standard drawing duly painted and written and as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
6
-
-
... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
1
-
-
... More
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
2
-
-
... More
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
1
-
-
... More
Providing & fixing of Semi reflective Traffic Sign Boards (cautionary, mandatory & informatory) as per standard drawing duly painted and written as directed by Engineer in charge. as per IRC/ MORD Specification for Rural Roads 2014.
42
-
-
... More
Direction and place indentification sign board up to 0.9 sqm size board. Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and as directed by Engineer in charge/ as per Clause 1701of MORD Specification for Rural Roads 2014. .
5.4
-
-
... More
Prepairing the DPR, Plane Table survey & Levelling for completion Plan as per Engineer-in-Charge & as per P.W.D. specification.
6
-
-
... More
Construction of reference/level pillers size 20x20x30 cm with R.R.stone masonry laid in mud mortar and plastering with cement sand morter (1:6 ) complete in all respect as per standard drawing and MORD specifications , for rural roads 2014.
240
-
-
... More
Construction of Back cutting piller size 30x30x40 cm with R.R.stone masonry laid in mud mortar and plastering with cement sand morter (1:6) complete in all respect as per standard drawing and MORD specifications , for rural roads 2014.
240
-
-
... More
Construction of Job pillers 40x40x60 cm with R.R.stone masonry laid in mud mortar and plastering with cement sand morter (1:6 ) complete in all respect as per standard drawing and MORD specifications , for rural roads 2014
2
-
-
... More
Cost of Environment Protection
850
-
-
... More
Maintainance Activities:
-
-
-
... More
Slip clearance of earth and boulders and other small loose materials after hill side cutting in rainy season including disposal of material as directed by Engineer-in-charge and as per Clause 1611 MORD specifications for Rural Roads 2014 .
-
-
-
... More
1St year
8166.67
-
-
... More
2nd year
8166.67
-
-
... More
Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping includingi clearing miner slips (0.30m3/ rm) regrading specification Clause 1908 of MORD Specification for Rural Roads 2014 . ( twice in a year)
-
-
-
... More
1St year
6
-
-
... More
2nd year
6
-
-
... More
Maintenance of Slab type Culverts/ Scupper/ Hume Pipe by way of learing, Cleaning, Erosionrepair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1909 of MORD Specification for Rural Roads 2014 ( twice in a year)
-
-
-
... More
1St year
39
-
-
... More
2nd year
39
-
-
... More
Maintenance of Carriage way including shoulders by filling ruts, dressing of surface, repair of edges, raincuts etc. as per MORD Specification for Rural Roads 2014
-
-
-
... More
1St year
2700
-
-
... More
2nd year
2700
-
-
... More
Maintenance of 200 metre stones , km stones , 5th Km stone and edge stone by way of refixing of tilted stones repairing with stone as per drawing and MORD Specification for Rural Roads 2014
-
-
-
... More
1St year
6
-
-
... More
2nd year
6
-
-
... More
Maintenance and Cutting of branches of trees shrubs and trimming of grass and bushs weeds as per Clause 1914 & 1915 of MORD Specification for Rural Roads 2014 ( twice in a year)
-
-
-
... More
1St year
6000
-
-
... More
2nd year
6000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements