Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Uttarakhand PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date7 Jul 2018
Closing Date19 Jul 2018
Tender Amount₹ 2,83,92,000 
Notes
Download

Costs

Summary

construction of road from UT-13-74 Barethi-Banchura-Badrigarh MR to Jonkhoni MR Stage-II

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90

773.98

-

-

... More
PROTECTION WORK

-

-

-

... More
Excavation for Structures: - Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MORD specification.

1038.7

-

-

... More
Random Rubble stone masonry for structure laid dry by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge.

1490.4

-

-

... More
Random Rubble stone masonry for structure laid 1:5 by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge.

1085

-

-

... More
Hand packed stone filling in the back of retaining walls, abutments, wing walls etc. by locally available approved stone including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer in charge.

658.9

-

-

... More
Providing R.C.C edge stone on valley side of formation as per drawing and Technical specification Clause 1608.2.6 as per MORD with M15 conc. Steel.

2097.5

-

-

... More
Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. Required for proper completion of the work. (As per PWD Uttarakhand specifications) For Parapet

59.4

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia G.I. Wire conforming to IS: 280 & IS: 4826 in 100mm x 100mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specification of MORD and as directed by Engineer in charge.

393.75

-

-

... More
Construction of Hill side pucca drain in accordance with the requirement of specification true to lines and grades. Dimensions and other perticulars as per drawing including all material, labour, T&P ect. Required for proper completion of the work and technical

-

-

-

... More
Excavation

270

-

-

... More
RR 1:5

183.2

-

-

... More
Plaster in 1:4 cement sand mortar

990

-

-

... More
Construction of Hill side Kuccha drain in accordance with the requirement of specification true to line and grades. Dimensions and other particulars as per drawing including all material labour T&P. etc. required for proper completion of the work as directed by Engineer in charge.

2965

-

-

... More
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.

1869.56

-

-

... More
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

1074.89

-

-

... More
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

1028.04

-

-

... More
Providing and applying primer coat with bitumen emulsion ( SS-I) on prepared surface of water bond macadam base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 Kg/Sqm using machanical means as per MORD Specification.

13788.25

-

-

... More
Providing and applying Tack coat with bitumenous emulsion ( RS-I) using emulsion distributor @ 0.25 to 0.30 Kg per Sqm on the prepared bituminous surface treated with primer & cleaned with hydraulic broom as per MORD Specification.

13788.25

-

-

... More
Providing, Laying and rolling of open - graded premix carpet of 20mm thickness(Emulsion used for cold mix shall be form a suppliar who will be authorished of IPR's owner i.e CRRI, Delhi) composed of 13.2 mm to 11.2 mm nominal size aggregates using penetration grade bitumen to required line, grade and level to serve as (range 22.4mm to 5.6mm) wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capecity, finished to riquired level and grades to be followed by seal coat of Type ''B'' as per MORD Specification.

13788.25

-

-

... More
Provinding and laying seal coat for sealing the voids in a bituminous surface laid to the specification levels, grade and cross fall using Type "B" as per MORD Specification.

13788.25

-

-

... More
CROSS DRAINAGE WORKS

-

-

-

... More
Construction of R.C.C. slab scupper including catchpit with R.R. stone masonry laid in 1:5 cement, mortar & RCC M25 grade slab, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & directed by Engineer-in-Charge.

-

-

-

... More
Excavation

72.48

-

-

... More
PCC M-10 (1:3:6)

1.53

-

-

... More
RR 1:5

15.11

-

-

... More
HYSD Reinforcement bar

2.32

-

-

... More
RCC M-25

2.71

-

-

... More
PCC M-20

0.26

-

-

... More
H.P Stone Filling

6.6

-

-

... More
ROAD FURNITURE

-

-

-

... More
Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing, directed by Engineer-in-charge and MORD Specification Clause 1703.

-

-

-

... More
Ordinary Kilometer Stone (Precast)

5

-

-

... More
200 m stone (precast)

21

-

-

... More
Providing & fixing of PMGSY Logo Board at starting point, end point and at every 2 Km distance of road length as per attached standard drawing duly painted and written and as directed by Engineer in charge. as per MORD specification Clause 1701

3

-

-

... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and written as directed by Engineer in charge. as per MORD specification Clause 1701 .

1

-

-

... More
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .

1

-

-

... More
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2. 600 mm equilateral & triangle

13

-

-

... More
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .

1

-

-

... More
White washing two coats on parapet walls and tree turnks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916 of MoRD specifications for Rural Roads 2014.

1689.6

-

-

... More
Prepairing the Plane Table survey & Levelling for completion Plan as per Engineer-in-Charge & as per P.W.D. specification.

4.2

-

-

... More
Maintenance Activities:

-

-

-

... More
Major Slip Clearance in all Type of Soil ,rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification of work 1611

-

-

-

... More
Ist Year

251.7

-

-

... More
Iind Year

226.53

-

-

... More
IIIrd Year

203.88

-

-

... More
Ivth Year

183.49

-

-

... More
Vth Year

165.14

-

-

... More
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of work

-

-

-

... More
Ist Year

8.39

-

-

... More
Iind Year

7.55

-

-

... More
IIIrd Year

6.8

-

-

... More
Ivth Year

6.12

-

-

... More
Vth Year

5.51

-

-

... More
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301

-

-

-

... More
Ist Year

8.39

-

-

... More
Iind Year

7.55

-

-

... More
IIIrd Year

6.8

-

-

... More
Ivth Year

6.12

-

-

... More
Vth Year

5.51

-

-

... More
Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)

-

-

-

... More
Ist Year

12.59

-

-

... More
Iind Year

11.33

-

-

... More
IIIrd Year

10.19

-

-

... More
Ivth Year

9.17

-

-

... More
Vth Year

8.26

-

-

... More
Routine Maintenance- Under PBMC:- Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year). 9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.

-

-

-

... More
1st year

4.2

-

-

... More
2nd year

4.2

-

-

... More
3rd year

4.2

-

-

... More
4th year

4.2

-

-

... More
5th year

4.2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.