Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Uttarakhand PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Dec 2018
Closing Date3 Jan 2019
Tender Amount₹ 5,92,92,665 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Make super elevation on curves with making walling along raised edge and filling earth & boulder for required height complete. Including cost of all material. Labour and T&P etc. As per I.R.C .super elevation must required on blind curves and more than 7% hence for 6.6+6.9/2 mt, width = 0.47 say 0.50mt.

-

-

-

... More
Excvation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer- in - charge. For retaining wall & B/W

316

-

-

... More
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of engineer-in-charge(As per PWD uttarakhand specification)

984.77

-

-

... More
Filling in foundation trenches as per drawing and technical specification clause 305.3.9 earth filling (for marshy soil)

4500.4

-

-

... More
Patrie filling after consolidation of ballast and black top of the road with wall in and locally available E&B required for proper completion of the work.

-

-

-

... More
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer-in-charge. For retaining wall & B/W

269.27

-

-

... More
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of engineer-in-charge(As per PWD uttarakhand specification)

823.56

-

-

... More
Construction of sub gradeand earthen shoulder . Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical specification clause 303.1

6030.03

-

-

... More
Sub Base

-

-

-

... More
Granular sub-base/surface source with local materials (Table 400.13) by mix in place method normal construction of Granular sub-base by providing local material spreading in unifrom layers with motor grader on prepared surface, mixing by mix in place method with rotator at once and compacting with smooth wheel roller to acheive the desired density complete as per clause 401.4 as per technical specification clause 408.

7967.62

-

-

... More
WBM Grading 3 Providing, laying, spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per technical specification clause 405.

2732.66

-

-

... More
PAVEMENT

-

-

-

... More
Low porosity providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical specification clause 502.

36548.95

-

-

... More
Poviding and applying tack coat with Bitumen emulsion(RS-1) using emulsion distributor at the rate of 0.20 to 0..25 Kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503.

36548.95

-

-

... More
20mm thick open-graded premix carpet using bituminous(bitumen emulsion) binder providing, laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base,including mixing in a suitable plant, laying and rolling with a three wheel 80-100Kn static roller capacity, finished to required level and grades to be followed bt seal coat of either type A or type B or type c as per technical specification clause 508

36548.95

-

-

... More
Seal Coat providing and laying seal coat sealing the voids in a bituminous surface laid to the s technical specification clause 510 by manual means case-I : Type A Bitumen ( S-90)

36548.95

-

-

... More
PROTECTION WORK

-

-

-

... More
Earth work in excavation for structures as per drawing and technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dresing of sides and bottom and backfilling in trenches with excavated suitable material. (Excavation in foundation for retaining & breast wall in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer-in-charge. for retaining wall & B/W.

1009.12

-

-

... More
Construction of retaining wall/breast walls in cement mortar 1:5 as per drawing and technical specification clause 1604. ( RR stone masonary in cement mortar 1:5)

1838.32

-

-

... More
Random Rubble Stone Masonary laid Dry, in breast walls, retaining wall, etc. including supply of all material labour, T&P and royalities etc. complete as per drawing and technical specification clause 702,704,1202,&1203 of Mord specification.

1597.33

-

-

... More
Hand packed stone filling in back of walls including cost of all materials, royality, T&P etc. complete as per direction of engineer-in-charge.(As per PWD uttarakhand specification)

769.94

-

-

... More
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specification Clauses 1301

67.5

-

-

... More
Cement plum concrete with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour,T&P etc. required for proper completion of the work as per drawings and technical specification clause 802, 803, 1202 & 1203 of MORD specification

67.5

-

-

... More
Construction of parapet

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Excavation in foundation for retaining & breast walls in all types of soil and rocks including lead, lift and disposal of surplus material as per direction of engineer-in-charge for retaining wall & B/W)

64.58

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification clause 802, 803, 1202 & 1203

-

-

-

... More
Nominal Mix 1:3:6

32.29

-

-

... More
C C M25

15.12

-

-

... More
R R stone masonary in cement mortar 1:5 as per drawing and technical specification clause 1604 (RR stone masonary in cement mortar 1:5)

226.8

-

-

... More
Plastering in 1:4 cement mortar

1234.8

-

-

... More
pointing

504

-

-

... More
White Washing

1738.8

-

-

... More
SIDE DRAIN

-

-

-

... More
Construction of hill side drain in accordance with the requirement of specification true to lines and grades. Dimensions and other particulars as per drawing and technical specification clause 1606.1

-

-

-

... More
Eathwork in excavation for structures as per drawing and technical specification

274.24

-

-

... More
plain cement concrete M10grade

73.13

-

-

... More
Nominal Mix (1:2:4)

115.66

-

-

... More
CROSS DRAINAGE WORK ( CAUSEWAY )

-

-

-

... More
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer-in-charge. For retaining wall & B/W

712.22

-

-

... More
Providing and laying apron with stone boulders as per drawings & technical specification clause 1301

78.66

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification clause 802, 803, 1202 & 1203

-

-

-

... More
Nominal Mix 1:3:6

90.98

-

-

... More
R.C.C grade M25

39.33

-

-

... More
Supplying, fitting, and placing HYSD bar reinforecement in superstructure complete as per drawing and technical specifications clause 1002, 1010 and 1202

15.44

-

-

... More
Construction of retaining wall/breast walls in cement mortar 1:5 as per drawing and technical specification clause 1604. ( RR stone masonary in cement mortar 1:5)

237.96

-

-

... More
R.C.C Bridge

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Ordinary soil upto 3m depth )

613.4

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification clause 802, 803, 1202 & 1203 (Nominal Mix 1:3:6)

23.28

-

-

... More
Poviding and laying reinforced cement concrete in superstructure as per drawing and technical specification clause 800, 1205.4 and 1205.5 ( RCC M25)

78.2

-

-

... More
Stone masonary in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204. ( Coursed Rubble Masonary in 1:4 cement sand mortar

178.51

-

-

... More
Stone masonary in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204. ( Coursed Rubble Masonary in 1:5 cement sand mortar

165.18

-

-

... More
Random Rubble masonary laid dry in breast wall , retaining wall, parapets, scupper etc. Including supply of all materials , labours, T&P royality etc required for proper compilation of work

25.62

-

-

... More
HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work complete as per drawing & technical specification clause 1204.3.8

234.75

-

-

... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification clauses 613.3 and 1204

214.84

-

-

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC/PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards face complete as per drawing and

32

-

-

... More
Supply fitting and placing HYSD bar reinforcement in superstruture complete as per drawing and technical specification clauses 1002, 1010 and 1202.(13-2)

90.1

-

-

... More
Drainage spouts complete as per drawing and technical Nos. specification clause 1209.

4

-

-

... More
Plain/ reinforced cement concrete in substructure complete as per drawings and technical specification clauses 802, 804, 805, 806, 807, 1202, and 1204, PCC grade M-20 Nominal mix (1:2:4)

0.75

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS :280 and IS :4826 in 100mm * 100mm mesh (woven diagonally) including 10 percent extra

56.25

-

-

... More
Providing and fixing in position pipe railing consisting of IS Rolled tell joist posts designation ISMB 100 (100x75) at 2.5 m interval and three row of 50mm dia steel pipe (light) including fixing in position on bridge deck complete as per drawing and te

20

-

-

... More
ROAD FURNITURE WORK

-

-

-

... More
Providing & fixing of PMGSY Logo Board at starting point, end point and at every 2 Km distance of road length as per standard drawing duly painted and written and as directed by Engineer in charge/ as per MORD Specification clause 1701

3

-

-

... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification clause 1701

2

-

-

... More
Providing 7 fixing of citizen information board with PMGSY logo at starting or prominent location (Where maximum no. of citizen can view the details of the road ) as per attached standard drawing dully painted and written as directed by engineer in charge as per MORD specification Clause 1701

2

-

-

... More
Retro-reflectrorised traffic signs providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3, fixed over aluminium sheeting 2mm thick with area not exceeding 0.9sqm supported on a mild steel single angle iron post 75*75*6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450*450*600mm,600mm below ground level as per approved drawing and technical specification clause 17010

6

-

-

... More
Providing & fixing of maintenance information board with PMGSY Logo at starting or prominent location ( Where maximum no. of citizen can view the detail of the road) as per attached

1

-

-

... More
Providing and fixing of semi reflective cautionary, mandatory and information sign board as per IRC:67 made of 1.5mm thick MS sheet duly stove white colour in front and gray colour on back with red reflective border of 65mm width and required letters and figures with reflective tape engineering grade as per clause 1701.3.9 of MORD for Rural road of required shade and colour supported and welded on 47mm*47mm*12 Swg sheet tube firmly fixed to the ground by mean of properly designed foundation with M-15 grade cement concrete 450*450*600mm, 600mm below ground level as per approved drawing clause 1701.2.2.1(600mm equilateral triangle)

10

-

-

... More
OTHER WORK

-

-

-

... More
Preparation of stage II road plan including making of existing proposed retaining wall/ Breast Wall & parapet wall and plan ofpainted surface including position of curves , extra widening and passing places preparation L-section of the road and marking of provision for L section correction (if required) existing and proposed CD work including theirlevel testing of CBR/km & LL, Pl & Pi preparation of stageII DPR with necessary design and drawing in 5 hard copies and 2 soft copies and contractor benifits @10%

10.5

-

-

... More
Maintenance Activities:

-

-

-

... More
Major Slip Clearance in all Type of Soil ,rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification of work 1611

-

-

-

... More
Ist year

630

-

-

... More
2nd year

567

-

-

... More
3rd year

510.3

-

-

... More
4th year

459.27

-

-

... More
5th year

413.385

-

-

... More
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of work

-

-

-

... More
Ist year

21

-

-

... More
2nd year

18.9

-

-

... More
3rd year

17.01

-

-

... More
4th year

15.309

-

-

... More
5th year

13.7781

-

-

... More
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301

-

-

-

... More
Ist year

21

-

-

... More
2nd year

18.9

-

-

... More
3rd year

17.01

-

-

... More
4th year

15.309

-

-

... More
5th year

13.778

-

-

... More
Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)

-

-

-

... More
Ist year

31.5

-

-

... More
2nd year

28.35

-

-

... More
3rd year

25.515

-

-

... More
4th year

22.9635

-

-

... More
5th year

20.6672

-

-

... More
PBMC Activities

-

-

-

... More
Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year). 9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.

-

-

-

... More
Ist year

10.5

-

-

... More
2nd year

10.5

-

-

... More
3rd year

10.5

-

-

... More
4th year

10.5

-

-

... More
5th year

10.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.