Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Uttarakhand PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Eprocure
Opening Date20 Feb 2019
Closing Date12 Mar 2019
Tender Amount₹ 857 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)

3213

-

-

... More
SUB-BASE WORK

-

-

-

... More
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using Gravel mix soil

8746.44

-

-

... More
BASE WORK

-

-

-

... More
WBM Grading-2…..Mechanical Means Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

4074.63

-

-

... More
WBM Grading-3….. Mechanical Means Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

4074.63

-

-

... More
SURFACING WORK

-

-

-

... More
Primer Low Porosity, Providing and applying primer coat with Bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502,

54328.5

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion sq.m pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503

54328.5

-

-

... More
Providing laying and rolling of cold mixed open-graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade Catonic Bitumen Emulsion(MS Premix) (Tailor made binder) to required line, grade and levelto serve as wearing cousre on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type B as per MORD Specification clause 506.2

54328.5

-

-

... More
Providing and laying seal coat by Bituminous Emulsion (SS- 2) (Tailor made binder) as binder for sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using as per Technical Specification Clause 508

54328.5

-

-

... More
Construction of K.C.type drains as per drawing including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1

297.5

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204, Random rubble masonry, In cement mortar (1:5)

202.3

-

-

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 .

987.7

-

-

... More
Maintenance of drains. The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regarding,deepening of side drains as well as catch water drains as per techinical specification clause 1907 (two times in year)

16537

-

-

... More
PROTECTION WORK

-

-

-

... More
Excavation for Structures, Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

1723.23

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204, Random rubble masonry, In cement mortar (1:5)

1379.62

-

-

... More
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction.

1852.29

-

-

... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)

564.36

-

-

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

288.15

-

-

... More
Construction of parapet in RR stone masonry laid in 1:5, C/S mortar providing M20 cement concrete in top, plaster in 1:4 C/S mortar & flush pointing in 1:3 C/S mortar as required and specified in detailed drawing with white washing complete as per the direction of Engineer in charge.(with & without base CC M10 )

-

-

-

... More
Excavation for structures

484.5

-

-

... More
P.C.C grade M 10, Nominal mix 1:3:6

484.5

-

-

... More
RR Stone Masonary in 1:5 Cement Motar

1326

-

-

... More
P.C.C. grade M 20, Nominal mix (1:2:4)

51

-

-

... More
Pointing with cement mortar (1:3)

2932.5

-

-

... More
Plastering with cement mortar (1:4), 15 mm thick for

4258.5

-

-

... More
White washing of parapet walls of CD work and tree truncks,White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915

7497

-

-

... More
Providing and fixing of C.C edge stones 12cm *12cm*60cm size precast in M15 cement concrete with 4 nos. 8 mm dia HYSD vertical bars and 3 nos 6mm dia MS bar stirrups as per approved drawing including two coat white washing on valley side of formation as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.

4250

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

1912.5

-

-

... More
CD WORKS (Improved Causeway)

-

-

-

... More
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, P.C.C grade M 10, Nominal mix 1:3:6

382.26

-

-

... More
Supplying ,Fitting and placing HYSD Bar rainfocement in foundation complete as per drawing and technical specification Clause 1000 and 1202

78.25

-

-

... More
Plain / Reinfocement cement concrete in foundation complete as per drawing and technical specification clause 802,803,1202,1203, PCC Grade M 15 (1:3:6 )

199.41

-

-

... More
ROAD FURNITURE

-

-

-

... More
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.

1

-

-

... More
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.

1

-

-

... More
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per IRC/ MORD Specification for Rural Roads 2014.

1

-

-

... More
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2. 600 mm equilateral & triangle

34

-

-

... More
Maintainance Activities:

-

-

-

... More
Deploying Hydraulic Excavators of 0.90 cum Bucket for clearance of major slip in all type of Soil, Rock and Boulders including its Operator, Fuel, all other charge and taxes required for proper completion of work.

-

-

-

... More
1st year

34

-

-

... More
2nd Year

30.6

-

-

... More
3rd Year

27.54

-

-

... More
4th Year

24.79

-

-

... More
5th Year

22.27

-

-

... More
Major Slip clearance in all type of Soil, Rock and Boulders including cast of all material , Machine, T&P and Taxes etc required for proper completion of work as per MoRD specifications, Clause 1611

-

-

-

... More
1st year

1020

-

-

... More
2nd Year

918

-

-

... More
3rd Year

826.2

-

-

... More
4th Year

743.58

-

-

... More
5th Year

669.29

-

-

... More
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90 (For Opening Communication Only)

-

-

-

... More
1st year

51

-

-

... More
2nd Year

45.9

-

-

... More
3rd Year

41.31

-

-

... More
4th Year

37.18

-

-

... More
5th Year

33.46

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 25 kg each As per drawing and technical Specifications clause 1301

-

-

-

... More
1st year

34

-

-

... More
2nd Year

30.6

-

-

... More
3rd Year

27.54

-

-

... More
4th Year

24.79

-

-

... More
5th Year

22.31

-

-

... More
Maintenance under PBMC for (1) Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. (2) Maintenance of road side Drains including minor slip clearence , reshaping, deepeming and regrading as well as catch water drains as per techinical specification clause 1907 (3)Maintenance of shoulder to the required level by filling / cutting the soil its compacting including disposal of the surplus material in approved muck disposal point as per specification Clause 1903 (4) Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908, (5) Maintenance of causeway by way of minor surface repairs replacing Guide Posts, repair of flood gauges, removal of debris provding boulders and protection work. (6) Maintenance of Road Signs, Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910 (7)Maintenance of 200 metre and km stones, Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 ( 8)Repairing of pot holes by removal of loose material of side , cleaning of surface and providing tack coat with bitumen emulsion, and patch repair with 20 mm thick pre-mix carpet using catonic bitumen emulsion and seal coat type B with bitumen emulsion. (9)two coat wite washing on parapet wall od CD work edge stone , tree truncks, and prominent rock patches on hill side including preparation of surface by cleaning as per Tech. Specification Clause 101

-

-

-

... More
1st year

17

-

-

... More
2nd Year

17

-

-

... More
3rd Year

17

-

-

... More
4th Year

17

-

-

... More
5th Year

17

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.