Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Eprocure
Opening Date17 Jul 2020
Closing Date1 Sep 2020
Tender AmountRefer Documents
Costs
EMD
₹ 90,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_PTC13_25016_1Bid Award Id
ViewTender No
SE(OandM)/PTCUL/HLD/14/2020-21Tender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Transportation of transformer from 132KV S/s, Bhowali to repair site including cost of unloading, transit insurance, taking all required permissions from road authorities etc.
1
-
-
Lifting of core assembly and dismantling of Old HV, LV & TV windings, cleaning of core, lamination, tank etc.
1
-
-
Reassembly of new HV, LV, TV and Tap coil windings including cost of new HV, LV, TV and Tap coil complete including matching all parameters winding resistance, percentage impedance etc. as per old transformer.
Considering cred for old winding approx. weight of HV Leg Coil - 770 Kg. Approx. weight of LV Leg Coil - 630 Kg. Approx. weight of TV Leg Coil - 189 Kg. Approx. weight of Tap Leg Coil - 330 Kg.
1
-
-
Cost of complete new insulation etc.
1
-
-
Cost of consumables.
1
-
-
Cost of Gaskets complete.
1
-
-
Cost of 52KV Neutral bushing with metal parts.
1
-
-
Cost of 145KV Condenser type bushing of Alstom/ABB/CGL make with metal parts.
1
-
-
Cost of 33KV Bushing with metal parts.
2
-
-
Cost of 11KV Bushing with metal parts.
2
-
-
Cost of supply and fixing of new marshalling box including cost of new microswitch type WTI & OTI and all control wiring etc.
1
-
-
Cost of PRV.
1
-
-
Cost of Silicagel breather.
1
-
-
Cost of Double float buchloz relay complete with alarm and tripping contact.
1
-
-
Overhauling of OLTC.
(a) Replacement of Gaskets.
(b) Lubricatio of mechanical system.
(c) All internal electrical connectioin complete.
(d) Replacement of Tap changer motor.
(e) Replacement of OLTC terminal barrier board.
1
-
-
Re-tanking after repair, providing and filling of fresh transformer oil (5.8 KL) and filtration, making thre rpeaired power transformer ready for all routine/acceptance test as per IS/IEC:2026/1977 with latest amendment.
1
-
-
Painting of transformer.
1
-
-
Routine testing at repair site of transformer as per IS/IEC:2026/1977 including (Turn ratio, Winding resistance, Insulation, Ten Delta, Magnetic current, SFRA) etc.
1
-
-
Transportation of repaired transformer from repair site to 132KV S/s, Bhowali including cost of transit insurance, taking all required permissions from road authorities etc.
1
-
-
Shifting/dragging of transformer from main road to plinth including making way of transformer filling of soil, stone, CC work etc. wherever is required for bringing the transformer safely.
1
-
-
Installation of transformer including fixing of conservator, radiator, OLTC, bushings, all jumpers, control wiring, oil filtration of transformer etc.
1
-
-
Testing of transformer as per IS 2026 including (Trun ration, Winding resistance, Insulation, Ten Delta, Magnetic current, SFRA etc.)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements