Power Transmission Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand PTCUL Tender

Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date9 Jan 2024
Closing Date12 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Complete pre-commissioning testing of 40 MVA transformer such as open circuit test short circuit test, vector group test, stability test, insulation test, winding resistance test, tan delta test, SFRA test and other including testing of HV and LV side bay equipments i.e. 132KV & 33KV CB's, 132KV & 33KV CT's, 132KV & 33KV PT's RTCC and C&R panels etc. and submission of test reports in three (03) copies jointly signed with O&M and T&C wing of PTCUL before charging of transformer, complete in all respects as per instructions of engineer in charge including cost of material, consumables, labour and T&P required for the proper completion of work.

1

-

-

... More
Collection of oil samples of transformer and its testing for DGA and other relevant, tests from CPRI as per direction of engineer in charge including cost of all material, consumables, labor and T&P required for the proper completion of work and submission of reports in three (03) copies at the earliest. (Top , bottom , OLTC)before and after charging of transformer.

6

-

-

... More
Inspection charges by electrical inspector

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.