Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date26 Dec 2023
Closing Date25 Jan 2024
Tender Amount₹ 3,17,190 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 11,000Document Cost
₹ 295Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PTC13_66871_1Bid Award Id
ViewTender No
SE(OandM)/PTCUL/HLD/50/2023-24Tender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
33 KV class insulation.
1
-
-
O rings & gasket kit.
1
-
-
Keyed blocks & spacers.
1
-
-
Tapping leads.
1
-
-
LV side insulators.
1
-
-
Tap switch.
1
-
-
Ovenning of Core Coil Assembly (CCA) two times to remove the moisture for at least 24 Hrs complete in all respect including coats of all material. consumables, labour and T&P.
6
-
-
All routine tests on Core Coil Assembly (CCA) as per 152026 before and after the removal of moisture.
6
-
-
Filtration of transformer oil complete in all respect including coats of all material, consumables, labour and T&P.
800
-
-
Assemebling of transformer complete in all respect including coats of all material, consumables, labour and T&P.
1
-
-
Repairing & welding of main tank of transformer which is damaged including checking and complete repair of the radiators complete in all respect including coats of all material, consumables, labour and T&P.
1
-
-
Painting of transfomer with two coats of good quality synihetic enameled paint of reputed make compleie in all respect including coats of all material, consumables, labour and T&P.
1
-
-
Safe loading of the transformer onto the truck, securing it with all leads and ropes for safe and sound transportation to 132 KV S/s Kathgodam and safe unloading of it on the plinth, complete in all respect including all labour and T&P.
1
-
-
Replacement of the damaged 33 KV pin insulator which is damaged due to arc formation during fuse blast including the replacement of damaged iumpers and clamps and fitting of the LT cable and energy meter complete in all respect including coats of all material, consumables, labour and T&P.
1
-
-
Less Copper Scrap
40
-
-