Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date29 Dec 2023
Closing Date18 Jan 2024
Tender Amount₹ 26,77,292.1 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 95,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PTC13_66969_1Bid Award Id
ViewTender No
SE(OandM)/PTCUL/HLD/54/2023-24Tender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying in position cement concrete of specified grade including the cost of centering shuttring - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
15
-
-
Providing and laying in position of reinforcement cement concrete, including the cost of cenetering, shuttering, finishing. All work up to plinth level; 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
25
-
-
Providing and laying in position cement concrete, including the cost of cenetering, shuttering, finishing. All work up to plinth level; 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
20
-
-
Providing and laying in position of reinforcement cement concrete, including the cost of cenetering, shuttering, finishing. All work up to plinth level; 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
5
-
-
Providing and laying in position cement concrete, 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
60.5
-
-
Bricks work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 Cement : 4 coarse sand).
70
-
-
12 mm cement plaster of mix : 1:4 (1 cement: 6 coarse sand).
510
-
-
MS Steel bar including supply of material, cutting, bending, moulding etc complete in all respect as per direction of engineer in charge
2.7
-
-
Supply and fixing of rolling shutters made of 80x1.25 mm machine rolled laths of approved make, MS Lath interlocked together through its entire length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets and arrangement for inside and outside locking with push and pull operation, work complete in all respect.
15
-
-
Top cover for rolling shutters 1.25 mm thick
4
-
-
27.5 cm long wire spring grade No. 2 for rolling shutters
4
-
-
Ball bearing for rolling shutters
2
-
-
Extra for mechanical devices chain and cranked operation for operating rolling shutters: exceeding 10.00 sqm and up to 16.80 sqm area of door.
3
-
-
Wiring for light point/ fan point/ exhaust fan point with 1.5 Sqmm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit with piono type switch, suitable size MS box and earthing the point with 1.5 Sqmm FRLS insulated copper conductor single core cable etc as required. (Group A)
11
-
-
Dismantaling of old and damaged security fencing base boundary wall and chain link mesh fencing by cutting of damaged chain link fencing, intermediate post and shifting of dismantaled old damaged and rusted chain link fecing at suitable place as per instruction of engineer in charge.
34
-
-
Structural steel works riveted, bolted or welded in built up sections, trusses, Heavy sections and of approved steel primer including cost of material,labour and T&P complete in all respect as per direction of engineer in charge.
1
-
-
Installation of corrgated G S sheet 1.00 mm thick roofing including vertical curved surface fixed with polymer coated J or L hocks bots and nuts 8 mm diameter with bitumen and G.I. impet washers or with G.I. limper washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal vertical or curves surfaces excluding the cost of purlins, rafters and trusses but including cutting to size and shape wherever requred and all consumables materal labour and T&P complete in all respect as per the direction of engineer incharge
135
-
-
White washing with lime to give an even shade : 13.37.1 New work (three or more coats) sqm 32.45
440
-
-
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
210
-
-
Finishing walls with Premium Acrylic Smooth interior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
230
-
-
Installation, testing and commissioning of celing fan of reputed make, including wiring the down rods of standard length upto 30 cm) with 1.5 sq mm FRLS PVC insulated copper cover on the fan box etc required as per site conditions including cost of all consumables, material, labour and T&P complete in all respect as per the direction of engineer incharge.