Power Transmission Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand PTCUL Tender

Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender

Works
Electrical and Electronics
Eprocure
Opening Date14 Mar 2024
Closing Date27 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
220 KV Mahuakheraganj-Kashipur D/C Line

136

-

-

... More
132 KV Mahuakheraganj-Kashipur D/C Line LILO

52

-

-

... More
Substation

-

-

-

... More
Hot-Spot scaning of all the outdoor equipment including 100 MVA transformer bushing and bus-bar of 220 KV switch yard with the help of thermovision camera and provided output report in soft and hard copy with equipment wise including all the labour material and T&P etc.( Once every three months and Four times in year as per direction of engineer-in charge)

28

-

-

... More
Hot-Spot scaning of all the outdoor equipment including 80 MVA transformer bushing and bus-bar of 132 KV switch yard with the help of thermovision camera and provided output report in soft and hard copy with equipment wise including all the labour material and T&P etc.( OOnce every three months and Four times in year as per direction of engineer-in charge)

28

-

-

... More
Hot-Spot scaning of all the outdoor equipment including bus-bar of 33 KV switch yard with the help of thermovision camera and provided output report in soft and hard copy with equipment wise including all the labour material and T&P etc. ( Once every three months and Four times in year as per direction of engineer-in charge)

40

-

-

... More
132 KV Substation Jaspur

-

-

-

... More
Transmission Line

-

-

-

... More
Hot Spot scanning of all joints of all the three phases of following lines complete with the help of thermovision camera as per direction of engineer in charge and providing output report of each line seperately in both soft and hard copies including all labour and T&P etc. required for proper completion of work. ( Once every three months and two times in six month as per direction of engineer-in charge).

-

-

-

... More
132 KV Jaspur-Kashipur(400) Line S/C

70

-

-

... More
132 KV Jaspur-Kalagarh Line S/C

130

-

-

... More
Substation

-

-

-

... More
Hot-Spot scaning of all the outdoor equipment including 40 MVA transformer bushing and bus-bar of 132 KV switch yard with the help of thermovision camera and provided output report in soft and hard copy with equipment wise including all the labour material and T&P etc. ( Once every three months and Four times in year as per direction of engineer-in charge)

24

-

-

... More
Hot-Spot scaning of all the outdoor equipment including bus-bar of 33 KV switch yard with the help of thermovision camera and provided output report in soft and hard copy with equipment wise including all the labour material and T&P etc. ( OOnce every three months and Four times in year as per direction of engineer-in charge)

52

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.