Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Civil And Construction
Road Construction
Eprocure
Opening Date22 Aug 2023
Closing Date12 Sep 2023
Tender AmountRefer Documents
Costs
EMD
₹ 1,38,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Constrcution Of Road At 132 Kv Srinagar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PTCU8_62287_1Bid Award Id
ViewTender No
37_SEC_OandMTender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources)
129.65
-
-
... More
Providing and filling in position, blown bitumen in expansion joints.
2.14
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars
1672.27
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
8.06
-
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer all complete.
5355
-
-
... More
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand)
181.44
-
-
... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.
1209.13
-
-
... More
Supplying and stacking at site.90 mm to 45 mm size stone aggregate
90.68
-
-
... More
Supplying and stacking at site.63 mm to 45 mm size stone aggregate
90.68
-
-
... More
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .
181.37
-
-
... More
Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity.
120
-
-
... More
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete. New work (Two or more coats)
42.68
-
-
Evaluation Notes How It Works ?