Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Dec 2019
Closing Date20 Jan 2020
Tender AmountRefer Documents
Costs
EMD
₹ 55,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Work Of Supply Erection Of New Tower
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_PTCUX_21436_1Bid Award Id
ViewTender No
T-13/SEOMCR/2019-20Tender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Double Suspension fitting for ACSR Panther conductor suitable for 70 KN Disc insulators.
3
-
-
... More
Suspension fitting for 7/10 SWG earth wire
1
-
-
... More
Armored Road for ACSR Panther Conductor.
3
-
-
... More
Danger Plate.
1
-
-
... More
Number Plate.
1
-
-
... More
Bird Guard.
6
-
-
... More
Anti-Climbing device barbed wire type.
1
-
-
... More
Pipe earthing (Set of 2 Nos)
1
-
-
... More
Vibration Damper for ACSR Panther Conductor.
6
-
-
... More
Vibration Damper for earthwire.
2
-
-
... More
Phase Plate (Set of three )
1
-
-
... More
Circuit Plate
1
-
-
... More
. For Tower no. 53 of 132 KV Line: Erection
-
-
-
... More
Survey including tower spotting, optimization of tower location, preparation of tower schedule etc.
0.7
-
-
... More
Setting of stub, including all foundation work excluding the concreting RCC and excavation.
1
-
-
... More
Lowering of ACSR Panther conductor from lines.
0.7
-
-
... More
Lowering / dismantling of earth wire from existing tower.
0.7
-
-
... More
Superstructure erection of section tower including all work above ground level, excluding hoisting of insulators and fitting of danger, number, phase plate and bird guards but including punching of bolts.
4
-
-
... More
Work of strengthening of suspension towers by providing stays to all three cross arms with the help of steel rope and turn buckle at suitable dry place near tower, including excavation of earth, grouting of stay with all necessary work required in order to ensure safety of next suspension tower (both sides ) to prevent from any distortion and safe Lowering/Dismantling and stringing of three line conductors and earth wire from suspension Towers.
2
-
-
... More
Stringing, tensioning, clamping, jointing etc, complete with ACSR Panther conductor including hoisting of insulators and fitting vibration dampers and all accessories for complete route of all the three power conductors including all accessories for completion of job..
0.7
-
-
... More
Stringing of Earth Wire with clamping, jointing etc, complete with all accessories for complete of job.
0.7
-
-
... More
Pipe earthling (Set of 2 Nos) and connecting with earth wire including all ground work, excavation , refilling etc.
1
-
-
... More
Tag welding on bolts on first section of tower
1
-
-
... More
Fixing of phase plate (Set of three).
1
-
-
... More
Fixing of number plate.
1
-
-
... More
Fixing of circuit plate
1
-
-
... More
Fixing of danger plate.
1
-
-
... More
Fixing of Bird Guard (Set of three )
1
-
-
... More
Work of dismantling of old Towers
2.2
-
-
... More
Shifting of material from store to working site including loading and unloading , headlining etc .
1
-
-
... More
Shifting of material from working site to store including loading and unloading , head loading etc.
1
-
-
... More
For Tower No. 08 of 220 KV Roorkee-Puhana LILO Line (Supply)
-
-
-
... More
D Type DC tower with bolts nuts, flat washers, pack washers & stub (Galvanized) .
8.8
-
-
... More
Single Tension fitting for single ACSR Zebra conductor suitable for 160 KN Disc insulators.
26
-
-
... More
Flexible copper bond.
2
-
-
... More
Repair sleeve for Zebra conductor.
6
-
-
... More
Disc insulator 160 KN
200
-
-
... More
OPGW Earth wire Tension assemblies, 24/48 fiber OPGW.
2
-
-
... More
OPGW Earth wire Junction box, 24/48 fiber OPGW
1
-
-
... More
Number plate
2
-
-
... More
Danger plate
2
-
-
... More
Circuit plate (set of 2)
2
-
-
... More
Phase plate (set of 3)
2
-
-
... More
Anti climbing device
1
-
-
... More
Pipe Type Earthing (Set of 2 No. each tower)
1
-
-
... More
For Tower No. 08 of 220 KV Roorkee-Puhana LILO Line (Erection)
-
-
-
... More
Super structure erection including all work above ground level excluding hoisting of insulators & fitting of danger, number , phase plate and bird guard but including punching of bolts and stub setting.("D" Type tower)
8.8
-
-
... More
Laying stringing, tensioning clamping, jointing etc. complete with ACSR Zebra conductor including hoisting of insulator & fitting of Vibration Dampers etc for complete route for D/C single Zebra.
0.673
-
-
... More
Laying stringing, tensioning clamping, jointing etc. complete with single earth wire (OPGW) including fixing of clamps and all accessories.
0.673
-
-
... More
Grounding work with Pipe Type Earthing (Set of 2 No. each tower)
1
-
-
... More
Tack welding on bolts & nuts on first section of tower.
1
-
-
... More
Danger plate
2
-
-
... More
Number plate
2
-
-
... More
Phase plate (set of 3)
2
-
-
... More
Circuit plate (set of 2)
2
-
-
... More
Anti climbing Device
1
-
-
... More
Destringing of 220 KV DC single Zebra Line and dismantled conductor shifting work up to central store Roorkee safely and place properly.
0.673
-
-
... More
Dismantling of existing tower and shifted to Roorkee central store and proper stacking at store.
8.1
-
-
... More
Destringing of OPGW Earth Wire and dismantled earth wire shifting work up to central store Roorkee safely and place properly.
0.673
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements