Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date17 Aug 2023
Closing Date16 Sep 2023
Tender Amount₹ 9,79,370 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 35,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PTC13_62086_1Bid Award Id
ViewTender No
SE(OamdM)/PTCUL/HLD/25/2023-24Tender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Re-routing of surface wiring/conduiting existing on internal and external walls of office premises by exacavting/chipping off of plaster of vertical walls in proper sizes placement of conduits/wires/busbars etc. as per standard procedures, re-plastering of affected area/patches with cement mortar 1:4 (1cement : 4 coarse sand) including cost of all material, consumables, labour and T&P complete in all respect as per the direction of engineer incharge.
150
-
-
... More
Application of white cement based putty of required thickness over plastered/uneven surfaces to prepare the surface even and smooth including cost of alll material, consumables, labour and T&P complete in all respect as per the direction of engineer incharge.
1850
-
-
... More
Finishing inner walls and ceiling with 100% premium qualit water-based, odour free, alkali & fungal resistance emulsion paint of preferred shade and finish and having very low VOCs (Volatile Organic Compound) including cost of alll material, consumables, labour and T&P complete in all respect as per the direction of engineer incharge.
1850
-
-
... More
Finishing outer walls with 100% premium quality water-based acrylic emulsion paint preferred shade and finish and having low VOC, alkali & fungal resistance, dirt resistance scraping of moss, blister etc. thoroughly from exterior surface of walls by the use of scraper, wire brush etc. including cost of all material, consumables, labour and T&P complete in all respect as per the direction of engineer incharge.
585
-
-
... More
Repairing, re-adjusment, re-alignment work for shutters of doors, window & ventilators including providing and fixing hinges/pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/neoprene gasket required for Anodised aluminium (anodised transparent or dyed to required shade according to IS:1868, Minimum anodic coating of grade AC 15) including cost of all material, consumables, labour and T&P complete in all respect as per the direction of engineer incharge.
50
-
-
... More
Rewiring for light point/fan point/exhaust fan point/cell bell point with 1.5 Sqmm FRLS PVC insulated copper conductor single core cable and 1.5 Sqmm FRLS PVC insulated copper conductor single core cable as earth wire in existing surface/recessed steel/PVC conduit including dismantling as required including cost of all material, consumables, labour and T&P complete in all respect as per the direction of engineer incharge.
25
-
-
... More
Wiring, re-wiring, circuit correction etc. alongwith the earthwire in required sizes of copper conductor, single core cables in surface/recessed PVC conduit as per site requirement.
150
-
-
... More
Replacement of burned/damaged switches, switch box and switch panels etc. by supply and fixing of suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 3 pin 5/6 & 5/6 amps modular socket outlet and 5/6 amps modular switch, connection, painting etc. as required including cost of all material, consumables, labour and T&P complete in all respect as per the direction of engineer incharge.
30
-
-
... More
Construction of documents storage wall fixed aluminium shelves/almirah with provision of adequate number of cells in minimum 18 inch depth complete with panes/clear glass door with lock and key including cost of all material, consumables, labour and T&P complete in all respect as per direction of engineer incharge.
120
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements