Power Transmission Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand PTCUL Tender

Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Apr 2023
Closing Date25 May 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of A Tower Between Rd 72 And Rd 73 For Proper Ground Clearance Of 220 Kv Rishikeshdharasu Line Ckt-ist

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cost of concreting including all material cement, sand & stone baloo in 1:1.5:3 ratio including shoring and shuttering reinforcement etc excluding RC steel.(1Cement: 1.5 Coarse Sand: 3 Graded stone aggregate 20 mm nominal size)

21.78

-

-

... More
Earth work in Excavation by manual means in foundation pits of any size, including dressing of sides and ramming of bottoms including getting out the excavated soil and disposal of surplus excavated soil as directed including alll leads & lifts. Ordinary soil / earth mixed with boulders / soft rock

50

-

-

... More
Earth work in Excavation by manual means in foundation pits of any size, including dressing of sides and ramming of bottoms including getting out the excavated soil and disposal of surplus excavated soil as directed including alll leads & lifts. In ordinary Rock / DFR / SFR

50

-

-

... More
Earth work in Excavation by manual means in foundation pits of any size, including dressing of sides and ramming of bottoms including getting out the excavated soil and disposal of surplus excavated soil as directed including alll leads & lifts. Hard rock

29

-

-

... More
Super structure erection including all work above ground level.(extension if required) B type tower

5.96

-

-

... More
Laying, stringing, tensioning, clamping, and jointing etc complete work with single ACSR Zebra conductor including hoisting of insulator and fitting, vibration dampers etc. for complete route for S/C single Zebra.

0.3

-

-

... More
Laying, stringing, tensioning, clamping, jointing etc complete work with single earth wire 7/9 SWG including fixing of fitting / clamps and all accessories.

0.3

-

-

... More
Cost of building revetment (including cost of all material) Earth work in excavation by manual means in benching/revetment work including disposal of surplus excavated soil as directed .with all leads and lifts, disposed earth to be neatly leveled and dressed Ordinary soil / earth mixed with boulders / soft rock

150

-

-

... More
Earth work in excavation by manual means in benching/revetment work including disposal of surplus excavated soil as directed .with all leads and lifts, disposed earth to be neatly leveled and dressed In ordinary Rock / DFR / SFR

100

-

-

... More
Earth work in excavation by manual means in benching/revetment work including disposal of surplus excavated soil as directed .with all leads and lifts, disposed earth to be neatly leveled and dressed Hard rock

50

-

-

... More
Rough stone and random rubbles with 1:6 cement mortar. (1 Cement :6 coarse sand)

70

-

-

... More
Cost of cement concreting required for bottom pad for revetment work in 1:3:6 ratio.(1Cement: 3 Coarse Sand: 6 Graded stone aggregate 20 mm nominal size)

5

-

-

... More
Cost of cement concreting in 1:2:4 ratio in taping of revetment work. (1Cement: 2 Coarse Sand: 4 Graded stone aggregate 20 mm nominal size)

1

-

-

... More
Providing and fixing weep hole with 75mm PVC pipe (pressure 6Kg/sqcm) in proper slope.

45

-

-

... More
Back filling of revetment wall with stone and ramming, including cost of material and T&P required for proper completion of work.

80

-

-

... More
Tack welding on bolts & nuts on first section of towers of 220 KV transmission line.

1

-

-

... More
Installation of counterpoise type earthing. (set of four for each tower)

1

-

-

... More
a) Danger Plate

1

-

-

... More
b) Number plate

1

-

-

... More
c) Phase plate

1

-

-

... More
De-stringing of ACSR Zebra conductor for complete route for Single Zebra.

0.3

-

-

... More
De-stringing of 7/9 SWG earth wire.

0.3

-

-

... More
Fabrication of required tower parts which is to be erected including trassing out from different type of tower parts available in store.

1

-

-

... More
Transportation of line material i.e. tower, stub, Conductor , Earthwire, fitting etc from Chamba store to Fakot (work site) and dismantled material from site to Chamba store including loading, unloading, headloading etc. including stacking material properly in store as per instruction of site incharge.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.