Power Transmission Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand PTCUL Tender

Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date14 Mar 2024
Closing Date15 Apr 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Water Storage Tank At 400 Kv Substation,

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Plastic 3000 Ltr. Capacity Water storage tank of appropriate brand like Sintex

1

-

-

... More
Control / LT/ Power cables

-

-

-

... More
Dismantelling old water tank manually/ by mechanical means including stacking of steel bars, serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge. (Complete work in all respect with all associated works)

1

-

-

... More
Making the arrangement for putting the temporary water storage (3000 Ltr.) tank to the desired/suitable place for the temporary connection of submersible pipe & of the water supply pipe (used for water supply to the colony, control room building & guest house etc.) to it including excavation, filling & PCC etc. complete in all respect as per the instruction of site incharge. All the T&P, labour & materials are in the scope of the contractor.

1

-

-

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm noninal size) upto plinth level with cement mortar 1:6 (1 cement : 6 coarse sand).

12.68

-

-

... More
Earth work in excavation by mechanical means Hydraulic excavator)/manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed including all leads & lifts. In ordinary Rock/DFR/SFR

12.85

-

-

... More
Supply and spreading of earth by earth work in excavation by mechanical means (Hydraulic excavation)/ manual means over surface areas, in trenches, plinth, sides of foundation etc., In layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including all lead lifts (land of earth supply to be arranged by the contractor at his own cost)

1.66

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size.

2.32

-

-

... More
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (M 15)

3.08

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (M20)

13.24

-

-

... More
Construction and Fixing of Top cover of Warter Tank with RCC (1:1.5:3) with supply of MS Angle, Steel, Flat etc. as required for satisfactory completion of work. (Complete work in all respect with all associated works)

1

-

-

... More
12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand)

54.68

-

-

... More
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.

-

-

-

... More
For vertical surface two coats @ 0.70 kg per sqm

30

-

-

... More
For horizontal surface one coat @1.10 kg per sqm.

28

-

-

... More
Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm

40

-

-

... More
Plumbering Work

-

-

-

... More
Making the connection of submersible pipe & of the water supply pipe (used for water supply to the colony, control room building & guest house etc.) and overflow etc. to the Temporary Plastic water storage tank complete in all respect. All the T&P, labour & material are in the scope of the contractor.

1

-

-

... More
Removal the connection of submersible pipe & of the water supply pipe from the Temporary Plastic water storage tank and then shifting this temporary tank to desired place as per the instruction of site incharge complete in all respect. All the T&P, labour & material are in the scope of the contractor.

1

-

-

... More
Making the provision of overflow & water drain pipe (used during cleaning of the tank) to the newly constructed water storage tank (RCC). Complete the job in all respect & as per the instruction of site incharge. All the T&P, labour & material are in the scope of the contractor.

2

-

-

... More
Making the connection of submersible pipe & of the water supply pipe (used for water supply to the colony, control room building & guest house etc.) to the newely constructed 28000 ltr. water storage tank (RCC) complete in all respect. All the T&P, labour & material are in the scope of the contractor.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.