Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Electrical and Electronics
Eprocure
Opening Date26 Dec 2023
Closing Date25 Jan 2024
Tender Amount₹ 4,68,990 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 17,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PTC13_66869_1Bid Award Id
ViewTender No
SE(OandM)/PTCUL/HLD/48/2023-24Tender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Destringing of single phase ACSR Panther Conductor or R and Y phase between tower No. 2-3, B Phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 of 132KV Bazpur-Haldwani line by safe opening of all clamps, connectors and fittings, lowering of damaged insulator strings with the help of pulley system and laying it properly on the ground complete in all respect as per direction of engineer incharge.
3
-
-
... More
Re-stringing of ACSR Panther Conductor of R phase tower No. 2-3, B phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 of 132KV Bazpur-Haldwani line with the help of liftey, pulley sytem including all related works such as hoisting of new insulators including measuing, cutting, clamping and all work above ground level complete in all respect as per direction of engineer incharge.
3
-
-
... More
Removing of temporary earthing at R phase between tower No. 2-3, B phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 for providing safe zone for safety of line workers complete in all respect as per direction of engineer incharge.
11
-
-
... More
Removing of turnbuckle and staywire etc. after completion of disc insulator replacement work between tower No. 2-3, B phase between tower No. 83-86, Y phase and B phase between tower No. 98-102 complete in all respect as per direction of engineer incharge.
11
-
-
... More
Transportation, loading and unloading of various kinds of line material such as disc insulators, fittings, tools and plants such as turn buckle, stay wire, ropes, liftys, pulleys, different tools, clamps and connectors etc. from 5 different sites in line route such as Barhaini, Gadgadia, Peepal Padao, Bhakhra Reserve Forest and Kamaluaganja Dohra areas to the stores of 220KV S/s, Kamaluaganja through motorable roads, non-motorable roads, dense forest areas on suitable vehicle as well as on foot including head loading in a total stretch of approximately 60-70 Kms. complete in all respect as per direction of engineer incharge.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements