Power Transmission Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand PTCUL Tender
Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date13 Aug 2024
Closing Date12 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 24,500Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Providing And Fixing Of 145 Kv Section Bus Isolator At 400 Kv
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PTCUX_74527_1Bid Award Id
ViewTender No
T-01/SE(OandM)S/2024-25Tender Authority
Power Transmission Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://https://www.ptcul.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
145KV Bus CVT clamp suitable for twin AAAC Tarantulla Conductor.
5
-
-
ERECTION
-
-
-
Opening of existing Jumpers (total 3 No.) of 145KV Main Bus-Bar with proper safety complete in all respect.
All the T&P, labour and materials are in the scope of the contractor.
3
-
-
Opening of existing droppers (total 3 No.) of 145KV Line CVT installed at Bay No. 104 with proper safety complete in all respect.
All the T&P, labour and materials are in the scope of the contractor.
3
-
-
Dismantelling of 1-phase 145V CVT from the fabricated structure with proper safety from the Bay No. 104 complete in all respect including opening of earthing. All the T&P, labour and materials are in the scope of the contractor.
It also includes the opening of all existing CVT connections with proper safety by skilled person.
3
-
-
Dismantelling of CVT junction box from the fabricated structure with proper safety from the Bay No. 104 complete in all respect. All the T&P, labour and materials are in the scope of the contractor.
It also includes the opening of existing wiring & earthing strips to the junction box.
1
-
-
Sorting as well as carriage of various tower parts to the work/erection site from various places at 400KV Substation, Khandukhal, Srinagar (G) for the fabrication of 3-Ph 145KV Bus isolator structure & 1-Ph, 3 No. 145KV Bus CVT structure as per instruction of Engineer in Charge. (Complete work in all respect).
1
-
-
Fabrication of tower parts for 3-phase 145KV Bus Isolator structure and mechanism, including cutting, welding, bending and fastening with different size GI nut, bolt, spring washer and cleat for proper holding of structure with safety includes proper earthing. (Complete work in all respect including all supplies except Tower Parts, which shall be provided by PTCUL).
1
-
-
Fabrication of tower parts for 1-phase 145KV CVT's structure including cutting, welding, bending and fastening with different size GI nut, bolt, spring washer and cleat for proper holding of structure with safety includes proper earthing. (Complete work in all respect including all supplies except Tower Parts, which shall be provided by PTCUL).
3
-
-
Shifting of dismanteled of 1-phase 145V CVT from the Bay No. 104 to the work site complete in all respect with proper safety. All the T&P, labour and materials are in the scope of the contractor.
3
-
-
Shifting of dismanteled CVT junction box with proper safety from the Bay No. 104 to the work site complete in all respect. All the T&P, labour and materials are in the scope of the contractor.
1
-
-
Shifting of new 3-phase 145V Bus Isolator from the store room to the work site complete in all respect with proper safety. All the T&P, labour and materials are in the scope of the contractor.
1
-
-
Erection of new 3-phase 145V Bus Isolator on the fabricated structure properly with safety complete in all respect. All the T&P, labour and materials are in the scope of the contractor.
1
-
-
Erection of 1-phase 145V CVT on the fabricated structure with safety complete in all respect. All the T&P, labour and materials are in the scope of the contractor.
It also includes the connection of earthing strips to its base structure.
3
-
-
Erection of CVT junction box on the fabricated structure with safety complete in all respect. All the T&P, labour and materials are in the scope of the contractor.
It also includes the connection of earthing strips to the junction box.
1
-
-
Removing & rearranging of trench cover inside the 132KV switchyard for the laying new control cables.
1
-
-
Proper connection, ferruling & dressing of following new control cable as per standard with the help of skilled labour under the supervision of Engineer/skilled person:
-
-
-
Connection of control cables inside the newely erected CVT's terminal box which are moving towards the junction box.
3
-
-
Connections of the follwoing control cables inside the junction box of the newely ercted CVTs:
a) Cables which are coming from the CVTs (R, Y & B-Ph) b) Cables which are moving towards the CPs & RPs of the Bay No. 107, 108 & 109 (if required).
1
-
-
Connection of the cables which are coming from the newely erected CVT Junction Box inside the CPs & RPs of the Bay No. 107, 108 & 109 (if required) inside the KIOSK at 132KV Swichyard complete in all respect.
1
-
-
Providing as well as laying of new control cable for these mentioned connections.
1
-
-
Work of Jumpering (total 6 No.) for new 3 phase 145KV Bus Isolator by new Jumpers/droppers and clamps with the help of AAAC Tarantulla conductor by sorting of conductor, cutting & tightening both side with all associated woks as per the instruction of site incharge. (Conductor will be provided by PTCUL). Complete work in all respect.
1
-
-
Connecting the 1 phase 145KV CVT to the 132KV Main Bus by new droppers and clamps with the help of AAAC Tarantulla conductor by sorting of conductor, cutting & tightening both side (CVT & Bus side) with all associated woks as per the instruction of site incharge. (Conductor will be provided by PTCUL). Complete work in all respect.
1
-
-
Complete Testing & commissioning of the newely erected 145KV Bus CVT before energization.
It also includes supervision of the CVT's measurment inside the CPs & RPs of Bay No. 107, 108 & 109 as per the instruction of site incharge.
1
-
-
Carriage of remaining & unuseful items/material from the erection site to J.E. (Maint.) store as per instruction of Engineer in Charge. (Complete work in all respect).
1
-
-
CIVIL WORKS
-
-
-
Earth work in excavation by mechanical means (Hydraulic excavator)/Manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal/filling of surplus excavated soil as directed, including all leads and lifts.
10.76
-
-
Providing and laying in position cement concrete of specific grade excluding the cost of centering and shuttering.1:4:8 (1 cement : 4 coarse sand : 3 graded stone aggregate 20mm nominal size).
1.8
-
-
Providing and laying in position specific grade of reinforced cement concrete, including the cost of centering, shuttering , finishing. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20m nominal size)
5.5
-
-
MS Steel Bar (including supply)
0.46
-
-
Providing and fixing bolts including nuts and washers complete
120
-
-