Power Transmission Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand PTCUL Tender

Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date7 Aug 2024
Closing Date24 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Safe and proper centrifuging of insulating oil of old and used GEC make 5 MVA, 132/33 KV transformer (quantity-approx 6 KL) by performing following activities as per the direction of engineer incharge including cost of all material, highly skilled manpower and special T&P (10-12 KL Transformer Oil Filteration Machine with Operator, Hose Pipes of required length, Oil Storage Tank of minimum 6 KL capacity with Oil Level Indicator and Breather arrangement filled with new silica gel & Comibrated PPM Kit). Complete replacement of all the gaskets of transformers is also to be done. (a) Sample testing of oil from drums for BDV & PPM before pouring into storage tank at site. (b) Sample testing of oil for BDV and PPM after completion of oil filtration in storage tank, before filling in transformer main tank. (c) Filling of transformer oil in main tank, OLTC & other accessories and complete assembly with prepared and tested oil under vacuum up to desired level. (d) Execution of Hot Oil Circulation Process and maintenance of temperature in tank up to 55°c for not less than 72 hrs to achieve desired insulation parameters of oil (BDV70KV & PPM=5). IR value has to be regularly recorded during the complete drying out process.

6000

-

-

... More
Collection of oil samples of transformer and its testing for DGA, PPM & BDV NABL approved laboratory preferavly from CPRI/PGCIL after completion of oil filtration work.

2

-

-

... More
Safe and proper dismantling of defective BBL make 5 MVA, 132/33 KV transformer existing on plinth by stepwise dismantling of OLTC, conservator tank, radiators, bushing etc. as per direction of engineer incharge including cost of all material, labour and T&P complete in all respect.

1

-

-

... More
Safe and proper dismantling of NIFPS system of defective BBL make 5 MVA, 132/33 KV transformer alongwith all accessories transformer and its accessories as per direction of engineer incharge including cost of all material, labour and T&P complete in all respect.

1

-

-

... More
Safe and proper shifting of diffective BBL make 5 MVA, 132/33 KV transformer from plinth to safer place as per direction of engineer incharge including cost of all cartage, labour and T&P complete in all respect.

1

-

-

... More
Safe and proper shifting of prepared GEC make 5 MVA, 132/33 KV transformer from store to plinth as per direction of engineer incharge including cost of all cartage, labour and T&P complete in all respect.

1

-

-

... More
Safe and proper erection of GEC make 5 MVA, 132/33 KV transformer by installation of radiators, bushing, conservator tank etc. as per direction of engineer incharge including cost of all material, labour and T&P complete in all respect.

1

-

-

... More
Safe and proper retrofittting of NIFPS system on GEC make 5 MVA, 132/33 KV transformer under supervision of OEM including cost of all material, labour and T&P complete in all respect.

1

-

-

... More
Safe and proper rearrangement of HV, LV & TER Jumpers for connecting spare 5 MVA Transformer to 3×5 MVA Transformer Bank as per the direction of engineer incharge including cost of all material, labour and T&P complete in all respect.

1

-

-

... More
Development of cable schedule and carrying outwork of cable laying all connections in marshalling boxes and NIFPS.

1

-

-

... More
Complete pre-comissioning testing of 3×5 MVA Transformer such as open circuit, short circuit, vector group, stability, insuation test, winding resistance test, tan delta, SFRA etc. including testing of HV/LV side bay equipments as per direction of engineer incharge including cost of all material, labour and T&P complete in all respect and submission of test report in 3 copies jointly signed with O&M and T&C wings of PTCUL.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.