Power Transmission Corporation Of Uttarakhand Limited Tender

View complete overview of Uttarakhand PTCUL Tender

Power Transmission Corporation Of Uttarakhand Limited - PTCUL Tender

Works
Civil And Construction
Eprocure
Opening Date10 Dec 2024
Closing Date31 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Work Of Strengthning Of Various Old Towers Legs And Foundations Of 132kv Bindal Rishikesh Line

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Work of strengthening of Towers by Providing stays to tower No-128A & 139B with the help of steel rope and Turn buckle at suitable dry place near tower, including excavation of earth, grouting of stay with all necessary work required in order to ensure safety of next tower to prevent from any distortion.

8

-

-

... More
Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work.((3*3*2)*6).

108

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (1*1*2)*6).

12

-

-

... More
Back earth filling after completing of foundation work with ramming, curing etc including all labour and T&P etc.

108

-

-

... More
Supply of MS Steel Bar

1.5

-

-

... More
Work of breaking CC in Chimney of tower No-128A & 139 B as per instruction of Ptcul Representatives including all labor and T&P etc.

6

-

-

... More
Work of fabrication of required tower stubs, leg for Tower No-128 A &139B including labour and T&P,generator etc. to complete the work.

1

-

-

... More
Work of dismentling of required tower stubs, leg, bressing and members of tower No. 128 A, &139B including labour and T&P etc. to complete the work.

0.8

-

-

... More
Work of erection and fixing of required stubs, leg for Tower No.128 A & 139B including labour and T&P,drilling, etc. to complete the work.

1

-

-

... More
Providing and Fixing of Pipe type earthing (set of 2 No. for each tower)after completion of work at Tower No-128A including excavation,backfilling & all labour and T&P etc.

1

-

-

... More
Work of tack welding of tower bolts and nut of first section including labour and T&P etc. to complete the work.

2

-

-

... More
PART B

-

-

-

... More
Work of fabrication of required tower Parts for Tower No.77A, 78C, 82C, 114A, 118A, 123A, 125A, 127A, 128 A, 129A,144B including labour and T&P,drilling, including labour and T&P,generator etc. to complete the work.

0.6

-

-

... More
Work of erection and fixing of missing tower parts, bressing and members for Tower No.77A, 78C, 82C, 114A, 118A, 123A, 125A, 127A, 128 A, 129A,144B including labour and T&P,drilling, etc. to complete the work.

0.6

-

-

... More
Work of tack welding of tower bolts of Tower No-77A,78C,82C,114A,123A,125A,127A,129A and nut of first section including labour and T&P etc. to complete the work.

8

-

-

... More
PART C

-

-

-

... More
Work of removing dust from Tower leg and making Cooping of towers stubs(T.no-64A, 66B, 69A, 70C, 71C, 72A, 73A, 76A, 77A, 78C, 81C, 82C, 84A, 87A, 89B, 94A, 96C, 101B, 106A, 107A, 112A, 115A, 119B, 124A, 130A,131A,133A,138A including all labour,material,Transportation and T&P etc.

60

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.