Pey Jal Nigam Uttarakhand Tender

View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender

Pey Jal Nigam Uttarakhand Tender

Works
Eprocure
Opening Date8 Dec 2021
Closing Date21 Dec 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Khadku Bhaneriya Water Supply Scheme In Block Syaldey Of District Almora

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE

1960

-

-

950

-

-

2100

-

-

... More
Excavation for pipe line trenches

-

-

-

... More
Excavation in soil mixed with single boulders etc. requiring the use of specials T&P, if any for pipe line trenches including lift up to 1.5 M and lead kup to 30 M with back filling, watering, ramming of excavated earth in trenches.

676.35

-

-

... More
Same as above but in medium rock by chiseling.

225.45

-

-

... More
Cartage of following sizes of valves up to site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber

-

-

-

... More
Gate valves

-

-

-

3

-

-

... More
Air valves

-

-

-

1

-

-

... More
Supply of all materials, labour, T & P etc and construction of Wheel Valve/ Water meter chamber as per type, design

4

-

-

... More
Supply of all materials, labour, T&P etc. and construction of RCC CWR of following capacities (in kiloliters)with M.S ladder outside & inside of the tank, M.S. M.H. Cover with locking arrangement, supply and fixing of outlet, inlet, overflow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body, vertical pipes, ladder, M.S. M.H cover etf. complete with approved water proofing (apex)/ enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes, specials and chlorinator.

-

-

-

... More
2.00 KL

1

-

-

... More
4.00 KL

1

-

-

... More
5.00 KL

1

-

-

... More
Making ferrule connection in the existing main of G.I, A.C, PVC or any type of pressure mains with saddle piece, service connections, fittings and fixing of G.M. ferrule including tapping the main, including all materials, ferrule, clamp etc. and bib cock.

49

-

-

... More
Protection work

-

-

-

... More
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge

112.5

-

-

... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work.

8.1

-

-

... More
PCC Nominal mix 1:2:4 (Hand mixed) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification

1.62

-

-

... More
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.

81

-

-

... More
Randum Rubble Stone Masonry laid dry including supply of all materials, labour, T&P etc. complete

24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.